Browse
Search
Agenda - 10-04-2011 - 8a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 10-04-2011
>
Agenda - 10-04-2011 - 8a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2011 2:56:01 PM
Creation date
11/28/2011 2:55:47 PM
Metadata
Fields
Template:
BOCC
Date
10/4/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8a
Document Relationships
Minutes 10-04-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 9 <br />Summary Worksheet: CLOSURE AND POST-CLOSURE COSTS <br />Facility: Orange County MS W Landf 11 <br />Permit Number: 68-01 <br />Facility Address: Eubanks Road, Chapel Hill, North Carolina <br />Facility Owner: Orange County, North Carolina <br />Representative Completing Format: Draper Aden Associates, William G. Hase, P.E. <br />Draper Aden Associates, Joel C. Daniel, P.G. <br />Date Completed: August 23, 2011 <br />North Side <br />Closure Costs: $0 <br />Post-Closure Care Costs: $1,756,988 <br />Corrective Action: $583,011 <br />South Side Combined <br />$3,116,720 $3,116,720 <br />$2;484,555 $4,241,544 <br />$0 $583,011 <br />Totals: $2,340,000 $5,601,276 $7,941,275 <br />Notes: <br />1. North Side unit closed in 1998, remaining post-closure period = 17 yeazs. <br />2. South Side closure costs include Phase 1 through Phase 4. <br />3. North Sidepost-closure unit costs shown are in 2000 dollars. <br />4. South Side unit costs shown are in 1998 dollars. <br />5. North Side corrective action unit costs shown are in 2009 dollazs. <br />6. Costs include gas collection and camtrol system as approved in October 8, 2009 permit modification, less <br />components installed in 2011. <br />7. Final costs adjusted for annual inflation and include 2011 inflationary multiplier of 1.01. <br />8. Additional items added to South Side closure costs in August 2011 (Section XIX). <br />67 <br />DAA #R00592-00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.