Browse
Search
Agenda - 10-04-2011 - 8a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 10-04-2011
>
Agenda - 10-04-2011 - 8a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2011 2:56:01 PM
Creation date
11/28/2011 2:55:47 PM
Metadata
Fields
Template:
BOCC
Date
10/4/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8a
Document Relationships
Minutes 10-04-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
66 <br /> 1. 452,000 CY Remaining <br />70 Months ~ <br />January 2016 <br /> <br />• Revise slopes from 4:1 to 3:1 <br />• Less-than 10% capacity <br />increase <br />• Additional 191,591 CY or <br />126,450 tons Advantaees <br />• No-public involvement process <br />• Extended site life <br />• Additional tipping fees ($50 x 126,450 extra tons = <br />$6,322,500) comps;-ed to existing permitted capacity - <br />• Easily constructed and maintained side slopes <br />• Does not exceed existing permitted height <br />. consistent with existing slope construction <br />No additional cell construction <br />Disadvantages <br />• Does not maximize potential airspace <br />• Extended site life may have negative impact on <br />public perception <br />2. 530,000-CY Remaining Advantaees <br />82 Months Extended site life <br />January 2017 Additional tipping fees ($50 a 177,930 extra tons <br /> $8,896,500) compared to existing permitted capacity <br />• Revise slopes from 4:1 to 3:1 Easily constructed and maintained side slopes to <br />• Maximum landfill height achieve maximum airspace <br />• Additiona1269,591 CY or Consistent with existing slope construction <br />177,930 tons No additional cell construction <br /> Disadvantaees <br /> • Public involvement process <br /> • Construction permit application renewal (5-yr permit) <br /> • Slightly increases_overall landfill height <br /> • Extended site life may have negative impact on <br /> public perception <br />3. 617,000 CY Remaining Advantases <br />96 Months Extended site life <br />March 2018 • Additional tipping fees ($50 -x 235 <br />350 extra tons = <br /> , <br />$11,767,503) compared to existing permitted <br />• Revise slopes from 4:1 to 3:1 capacity <br />• Maximum landfill height • Maximum airspace <br />• Includes slope wedge No additional cell construction- <br />s Addiflona1356,591 CY or Disadvantages <br />235,350 tons • Public involvement process <br /> • Construction permit application renewal (5-yr permit). <br />- • Slightly increases overall landfill height <br /> • Considerable difficulty in constructing wedge <br /> airspace. recovery over existing constructed side <br /> slopes <br /> • Extended site life may have negative impact on <br /> public perception <br />
The URL can be used to link to this page
Your browser does not support the video tag.