Browse
Search
Agenda - 10-04-2011 - 8a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 10-04-2011
>
Agenda - 10-04-2011 - 8a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2011 2:56:01 PM
Creation date
11/28/2011 2:55:47 PM
Metadata
Fields
Template:
BOCC
Date
10/4/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8a
Document Relationships
Minutes 10-04-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 7 61 <br />Proposed Solution for Solid Waste <br />Illegal Dump Sites <br />Orange County must~omply with I~CGS 130A-309.09A, 14-399, 15~A-136 and Orange <br />County Ordinances Sec 34-39 <br />Aetion to assist the Rogers Road Community: <br />County would hire an independent contractor to clean up theirindividual parcels, <br />with the owner's permission, and the county will assist the property owners- with <br />the process. <br />a. Establish a 3/4 mile radius around the landfill, mail a notice to all <br />property owners_anno_uncing_the_program, and_explaining how to <br />apply. <br />b. County would send out an RFP to select a contractor and lock ire unit <br />costs pricing that would apply to all parcels. (1) <br />c. Property owner would sign a release to participate,. releasing Orange <br />County from liability. <br />d. The County does not assume responsible or liability, each property <br />owner is responsible for their own property. <br />e. County could wave tipping fees for contractor. <br />f. County would require that all material would be delivered to the <br />Orange County Landfill. <br />g. Property owners will be given 180 days to decide if they want to <br />participate. <br />(1) Guidelines for OC approved vendor? E.g. -guidelines for estimating cleanup costs, <br />material limitations such as for recycling, currently existing materials, pictures of each <br />pile/group of dumped items prior to cleanup for verification, et. <br />
The URL can be used to link to this page
Your browser does not support the video tag.