Browse
Search
Agenda - 10-04-2011 - 7a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 10-04-2011
>
Agenda - 10-04-2011 - 7a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2011 2:49:17 PM
Creation date
11/28/2011 2:48:58 PM
Metadata
Fields
Template:
BOCC
Date
10/4/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7a
Document Relationships
Minutes 10-04-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
S Planning - Habitat for Humanity OC, NC Inc. - Tinnin Woods Project - Special Use Permit
(Message)
Path:
\Board of County Commissioners\Various Documents\2010 - 2019\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
87 <br />SECTION 2 2 AND 2 7 3 CONTINUED ("Yes" indicates compliance; "No" indicates <br />_1_____. <br />IIVI PlrVn1 ucana.~ <br />PLANNING <br /> BOARD EVIDENCE SUBMITTED <br /> RECOMMENDED TO SUPPORT BOCC <br />Ordinance <br />Re urrements FINDINGS - FINDINGS FINDI NGS <br />2.7.3 (g) (g) X Yes _ No The application package _ Yes _ No <br />26 copies of an contains the required <br />.Environmental information completed by <br />Assessment or Summit and The Catena <br />Environmental Impact Group. <br />Statement as -req-aired by <br />Section 6.16 of the UDO Staff has determined that <br /> a formal- Environmental <br /> Impact Statement is not <br /> required for the project <br /> and fias issued a Finding <br /> of No Significant Impact <br /> (FONSI) for the pr-oject <br />2.7.3 (B) (g) X Yes No The site plan contains a Yes No <br />Method of disposal of note indicating. that any <br />trees, limbs, stumps and- - .construction ar-land _ <br />construction debris clearing debris <br />associated with the generated on-site will be <br />permitted activity, which disposed of in <br />shall be by some method accordance with the <br />other than open burning. County's Solid Waste <br /> Management Ordinance <br />2.7.3 (B) (10) X Yes No The narrative provides a Yes No <br />Statement from the subdivision construction <br />applicant indicating the phasing schedule. Per <br />anticipated development the Orange County <br />schedule for the build-out School district's request, <br />of the project. the development <br /> schedule has been <br /> developed to <br /> accommodate school <br /> seating availability. <br />2.7.3 (B) (11) X Not Applicable The applicant is-not _ Not Applicable <br />Statement from the requesting vesting of the <br />applicant in justification of project. The applicant, <br />any request for vesting for however, has provided a <br />a period of more than two detailed timeline for the <br />years (five years development of <br />maximum) necessary infrastructure, <br /> - utility extensions, and the <br /> residences. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.