Orange County NC Website
81 <br />~~~•r~nw~ ~ o ~ ~ru.~T~~n iGn ~°vnc° ~.,.~~.-a*oc r-mm~lianr_p• "Nn" indir_atps nnn-comnliance~ <br /> PLANNING <br /> BOARD EVIDENCE SUBMITTED <br />Ordinance RECOMMENDED TO SUPPORT BOCC <br />Re uirements FINDINGS FINDINGS FINDINGS <br />ii. A detailed traffic X Not Applicable The application was _ Not Applicable <br />survey, regardless _ submitted prior to the <br />of the estimated adoption of the-UDO. <br />number of trips per <br />day, prepared in As a_resu.lt a formal <br />accordance with ail traffic Study would not <br />applicable NCD~JT have been required for <br />requirements or- this- project <br />standards as well <br />as Section 6.1 ~, <br />iii. The appropriate X Yes No A biological inventory Yes No <br />Environmental completed by the Catena <br />Document Group was submitted for <br />prepared in the project. <br />accordance with <br />Section 6.16,a and- The a_ppiicant also <br /> provided an <br /> environmental <br /> assessment completed <br /> by the Catena~Group and <br /> SummitEngineering <br /> denoting the presence of <br /> .wetland areas and <br /> protected streams on the <br /> property. <br />iv. A landscape plan X Yes - No The-site plan package Yes No <br />showing the contains the required <br />location of on-site landscape plan <br />significant trees, <br />proposed <br />screening, buffers, <br />and landscaping - <br />and any proposed <br />treatment of any <br />existing natural <br />features. <br />b. A summary of utility X Yes No The narrative contains Yes No <br />services. the required information. <br /> The applicant provided a <br /> copy of correspondence <br /> with Orange Alamance <br /> Water Systems (OAWS) <br /> concerning provision of <br /> public water service <br />