Orange County NC Website
117 <br />The total acreage fee will be approximately $6,250. <br />8. An Orange County Flat Fee for a -public sanitary sewer service tap, currently $600 <br />per unit, shall -be paid at the time building permit applications are submitted for <br />review and approval. This fee is subject to change and will be collected at the <br />applicable rate at the time -of review and- approval of the building permit. <br />9. A Hillsborough Capital Facilities Fee, currently $2672 per unit, shall be paid at the- <br />time building permit applications are submitted for- review and approval. This fee <br />is subject to change and will be collected at the applicable rate at the time of <br />review and approval of -the building permit. <br />10. For all locations where service is anticipated, a wye connector shall-be installed as <br />a service stub out, rather than a tap and_ saddle. <br />C. Water Liraes <br />1. Orange Alamance Water System, Inc. (OAWS)_ and the County Staff Engineer <br />shall approve final water line construction drawings for the entire subdivision, <br />including stubbed out service fines to each lot. No clearing or grading on the site <br />shall occur until approval is obtained. No water lines shall be placed underneath <br />paved or concreted areas with the exception of perpendicular crossings, which <br />shall be constructed of ductile iron pipe. <br />2. The existing two (2) inch service main to the five customers on a private drive on <br />the east side of Tinnin Road will remain and the developer will tie it into the new <br />Tinnin_ Road water main. <br />3. The existing th.r-ee (3) inch water main in Tinnin Road and School House Road will <br />remain in service for existing -customers only. <br />4. The new line will be pressure tested at the time of construction as required by <br />OAWS and the State of North Carolina. Pressures shall meet or exceed <br />established standards as detailed by OAWS and the State of North- Carolina. <br />5. The applicant shall install all water lines to OAWS specifications. Monitoring of <br />the installation of all water lines will be by OAWS and the County Staff Engineer or <br />other designated staff. All construction and testing shall be certified to the State <br />as completed by the engineer of record- with copies of the certification to be <br />provided to OAWS, the Orange County Engineer and Planning Department prior <br />to Planning signatures on the Final Plat. <br />OR <br />A letter of credit or escrow agreement shall be submitted and approved by the <br />County Attorney to secure construction of the water lines to the standards of <br />OAWS. 'An estimate of the construction cost shall be prepared by a <br />certified/licensed engineer and submitted to the Planning and Inspections <br />Department for review by the Orange County Staff Engineer. The financial <br />guarantee must reflect 110% of that estimate and be issued by an accredited <br />40 <br />