Orange County NC Website
116 <br />2. The Orange County Staff Engineer shall approve sewer line construction drawings <br />including elevations of the proposed lines, stubbed out service lines to each lot <br />within the development, and adjacent parcel stub outs as denoted on the <br />approved site plan prior to any clearing or grading on the site. The existing sewer <br />main located in Tinnin Road shall be used as the outfall for the proposed sewer <br />collection lines. No sewer lines shall be placed underneath existing paved or <br />concreted areas with the exception of perpendicular crossings. <br />3. The applicant shall install, to Orange County specifications, -eight-inch (8") sewer <br />lines within the project. All construction and testing shall be certified to the State <br />by the engineer of record as completed with copies of the certification to be <br />provided to the- Orange County Staff Engineer and Planning Department prior to <br />Planning signatures on the Final Plat. <br />OR <br />A letter of credit or escrow agreement shall be submitted and- approved by the <br />County Attor-ney to secure construction of the sewer lines to the standards of <br />Orange County. An estimate Hof the construction cost shall -be prepared by a <br />certified/licensed engineer and submitted to the Planning and Inspections <br />Department. The. financial guarantee must reflect 110% of that estimate and be <br />issued by an -accredited financial insti#ution licensed to do business in North <br />Carolina. <br />If the security option as set forth above is chosen., no certificate of occupancy for <br />any dwelling shall be issued until all sewer line construction and testing are <br />completed with certification sent to the State by the engineer of record and the <br />perm-it is issued by the State. Copies of the engineer's certification and State <br />permit shall be provided to the County Engineer and to the Planning Department <br />prior to release-of any certificate of occupancy. <br />4. Signed_ encroachment agreements, if required by North Carolina Department of <br />Transportation (NCDOT), shall be executed for all sewer lines that are placed <br />within public right-of-ways. Copies of signed encroachment documents shall be <br />provided to the Planning Department and the -County Staff Engineer prior to <br />Planning signatures on the Final Plat. <br />5. Show on the Final Plat, twenty (20)-foot permanent sewer line easements <br />centered on all County-maintained sewer lines located outside of the NCDOT <br />right-of-way. These easement areas shall remain free of structures, fences, and <br />landscape plantings. <br />6. Sewer lines shall be designed in such a manner to allow gravity flow extensions to <br />adjacent property rather than through- the use of pump stations to the extent <br />applicable to established engineering practices. <br />7. An Orange County Acreage Fee (recorded lot area acreage only), currently set at <br />$1000 per acre for public sanitary sewer service, shall be paid at the time the Final <br />Plat is submitted for planning signatures. The acreage fee is subject to change <br />and, based. on the acreage shown for the proposed 28 lots (approx. 6.25 acres). <br />39 <br />