Orange County NC Website
109 <br /> PLANNING <br /> BOARD EVIDENCE SUBMITTED <br />Ordinance RECOMMENDED TO SUPPORT BOCC <br />Re uirements FINDINGS FINDINGS FINDINGS <br />Section 5.1.5.6 (A) (3) <br />Standards of Evaluation <br />continued <br />F Grading and Erosion <br />Control <br />i. Plans for grading and X f~Fo Initial review of grading _Yes No <br />erosion control comply Yes plans by Orange County <br />with standards Erosion Control indicates <br />contained in the there will be no issues. <br />Orange County <br />Erosion and Sediment A condition of approval is <br />Con#rol Manual and that the formal grading <br />this Ordinance; and erosion control plan <br /> shall be reviewed and <br /> _ approved prior to earth <br /> disturbing activity. <br />ii. Construction is X No Staff has determined that _Yes No <br />phased to the extent Yes the project will comply. <br />practical to minimize <br />disturbance and <br />sedimentation; <br />iii. Sediment control X No Detention basins to Yes No <br />measur-es will be Yes handle silt and turbidity <br />properly installed to will be installed prior to <br />filter sediment from any grading. Conversion <br />runoff during of the devices wil4 occur <br />construction and as stabilization occurs in <br />maintained until the sub basins. <br />grading is complete <br />and a permanent A condition of approval is <br />vegetative cover has that the formal grading <br />been established and- and erosion control plan <br />a}I slopes stabilized; shall be reviewed and <br />and approved prior to earth <br /> disturbing activity. <br />iv. Permanent X No A condition of approval is _Yes No <br />landscaping, Yes that the formal grading <br />groundcover, mulch, - and erosion control plan <br />etc. will be installed as shall be reviewed and <br />soon as practical after approved prior to earth <br />construction activities disturbing activity. <br />for each phase are <br />completed. <br />32 <br />