Browse
Search
Agenda - 10-04-2011 - 7a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 10-04-2011
>
Agenda - 10-04-2011 - 7a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2011 2:49:17 PM
Creation date
11/28/2011 2:48:58 PM
Metadata
Fields
Template:
BOCC
Date
10/4/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7a
Document Relationships
Minutes 10-04-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
S Planning - Habitat for Humanity OC, NC Inc. - Tinnin Woods Project - Special Use Permit
(Message)
Path:
\Board of County Commissioners\Various Documents\2010 - 2019\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
109 <br /> PLANNING <br /> BOARD EVIDENCE SUBMITTED <br />Ordinance RECOMMENDED TO SUPPORT BOCC <br />Re uirements FINDINGS FINDINGS FINDINGS <br />Section 5.1.5.6 (A) (3) <br />Standards of Evaluation <br />continued <br />F Grading and Erosion <br />Control <br />i. Plans for grading and X f~Fo Initial review of grading _Yes No <br />erosion control comply Yes plans by Orange County <br />with standards Erosion Control indicates <br />contained in the there will be no issues. <br />Orange County <br />Erosion and Sediment A condition of approval is <br />Con#rol Manual and that the formal grading <br />this Ordinance; and erosion control plan <br /> shall be reviewed and <br /> _ approved prior to earth <br /> disturbing activity. <br />ii. Construction is X No Staff has determined that _Yes No <br />phased to the extent Yes the project will comply. <br />practical to minimize <br />disturbance and <br />sedimentation; <br />iii. Sediment control X No Detention basins to Yes No <br />measur-es will be Yes handle silt and turbidity <br />properly installed to will be installed prior to <br />filter sediment from any grading. Conversion <br />runoff during of the devices wil4 occur <br />construction and as stabilization occurs in <br />maintained until the sub basins. <br />grading is complete <br />and a permanent A condition of approval is <br />vegetative cover has that the formal grading <br />been established and- and erosion control plan <br />a}I slopes stabilized; shall be reviewed and <br />and approved prior to earth <br /> disturbing activity. <br />iv. Permanent X No A condition of approval is _Yes No <br />landscaping, Yes that the formal grading <br />groundcover, mulch, - and erosion control plan <br />etc. will be installed as shall be reviewed and <br />soon as practical after approved prior to earth <br />construction activities disturbing activity. <br />for each phase are <br />completed. <br />32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.