Orange County NC Website
• Space to accommodate the necessary setbacks, road <br /> ex ansions and other site amenities. <br />1 2 3 Access <br /> • Accessibility for pedestrians <br /> • Accessibility for vehicles <br /> • Accessibility for public transportation <br /> Total: Phase I <br /> (If total ranking equals 6 or more, excluding a ranking of <br /> one (1 , o to Phase II <br /> <br />Low Med Hi h Phase II <br />1 2 3 Centrality <br /> • Existing population <br /> • Growth and development <br /> • Proximity to schools <br /> • Proximity to retail <br /> • Proximity to other libraries <br /> • Site is not isolated <br /> 2 3 Site Conditions, Allowances, and Constraints <br /> • The cost-benefit conclusions of physical, legal, and <br /> entitlement site allowances/constraints <br /> • Technical and environmental assessments <br /> (planning/zoning, jurisdictional processes, etc.) <br /> • Environmentally sustainable (C&A, storm water mgt, <br /> buffers, energy "net zero" capacity) <br /> • Operationally sustainable <br /> • Defeats obsolescence <br />1 2 3 Cost and Availability <br /> • Cost for site acquisition <br /> • Timeframe for development of the site <br /> • -Terms for site control necessary for development <br /> process <br /> Total: Phase II <br /> (if the total ranking equals 6 or more, excluding, a ranking <br /> of one (1), o to Phase I I I)_ <br />Low Med Hi h Phase III <br />'I 2 3 Community Preference <br /> • Input from elected officials <br /> • Alignment with planning tools (Comprehensive Plan) <br /> • Input from a board cross-section of the area to be <br /> served <br /> • Orange County Library Advisory Board <br /> • Orange County & Carrboro Friends of the Library <br />