Browse
Search
Agenda - 10-06-2011 - 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 10-06-2011
>
Agenda - 10-06-2011 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2011 2:00:45 PM
Creation date
11/28/2011 2:00:44 PM
Metadata
Fields
Template:
BOCC
Date
10/6/2011
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes 10-06-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Space to accommodate the necessary setbacks, road <br /> ex ansions and other site amenities. <br />1 2 3 Access <br /> • Accessibility for pedestrians <br /> • Accessibility for vehicles <br /> • Accessibility for public transportation <br /> Total: Phase I <br /> (If total ranking equals 6 or more, excluding a ranking of <br /> one (1 , o to Phase II <br /> <br />Low Med Hi h Phase II <br />1 2 3 Centrality <br /> • Existing population <br /> • Growth and development <br /> • Proximity to schools <br /> • Proximity to retail <br /> • Proximity to other libraries <br /> • Site is not isolated <br /> 2 3 Site Conditions, Allowances, and Constraints <br /> • The cost-benefit conclusions of physical, legal, and <br /> entitlement site allowances/constraints <br /> • Technical and environmental assessments <br /> (planning/zoning, jurisdictional processes, etc.) <br /> • Environmentally sustainable (C&A, storm water mgt, <br /> buffers, energy "net zero" capacity) <br /> • Operationally sustainable <br /> • Defeats obsolescence <br />1 2 3 Cost and Availability <br /> • Cost for site acquisition <br /> • Timeframe for development of the site <br /> • -Terms for site control necessary for development <br /> process <br /> Total: Phase II <br /> (if the total ranking equals 6 or more, excluding, a ranking <br /> of one (1), o to Phase I I I)_ <br />Low Med Hi h Phase III <br />'I 2 3 Community Preference <br /> • Input from elected officials <br /> • Alignment with planning tools (Comprehensive Plan) <br /> • Input from a board cross-section of the area to be <br /> served <br /> • Orange County Library Advisory Board <br /> • Orange County & Carrboro Friends of the Library <br />
The URL can be used to link to this page
Your browser does not support the video tag.