Browse
Search
Agenda - 10-06-2011 - 2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 10-06-2011
>
Agenda - 10-06-2011 - 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2011 1:59:45 PM
Creation date
11/28/2011 1:59:39 PM
Metadata
Fields
Template:
BOCC
Date
10/6/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
2
Document Relationships
Minutes 10-06-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21 <br />POLICY AND PRQCEDURE MANUAL <br />pedestrian facility? <br />SIDEWALKS <br />28/1 <br />3. Continuity and Integration. The project provides a connection to an existing or a <br />proposed pedestrian network and will provide a critical link in the network. <br />• Is the project acritical -link in an existing network? <br />{For example, will this project provide a~nissing link in an existing network <br />where there are pedestrian facilities extending beyond the length of this project?) <br />• Is the project a critical link in a proposed network? <br />{Far example, will this project provide any link in a proposed network where <br />there will be pedestrian facilities extending beyond the length of this project?) <br />4. Location. The project is located within a Census defined urban area or growth area <br />where development is anticipated in the immediate future; a majority of the properties <br />within walking distance of the project- are developed; or projected to be developed within <br />5 years at urban type residential densities. This five year period will begin at -the <br />completion of the appr-opriate environmental document. <br />• Is the project located in a Census defined urban area? <br />• Is the project located in a growth area (Urbanized Area Boundary) where <br />development is anticipated in the immediate future, but is not in a Census defined <br />urban area? <br />• Are a majority of the properties within walking distance of the project developed, <br />or projected to r3e developed within 5 years at urban type residential densities <br />{a minimum of 1 dwelling unit per acre)? <br />5. Gener-ators. The project serves as a primary access from one or more of the following to <br />another: <br />• -day care, elementary or secondary school <br />• -college or university <br />• -community facility (such as a library or park) <br />• -public transportation <br />• -commercial, office, industry, or business centers <br />• -residential areas <br />• -Will any of these land-uses within two kilometers {1.2 miles) of the project use <br />this project as a primary access? <br />6. Safety. The project provides demonstrable safety benefits for pedestrians. <br />EFF. DATE 12/1/76 9 <br />REV. DATE 4/16/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.