Orange County NC Website
- Final Jordan Lake Allocation Applications now due August 2012 <br /> - EMC determines allocations in late 2012/early 2013 <br /> - A reminder that the RWSP will not serve as Orange County's Jordan Lake Allocation <br /> Application to NC DWR. <br /> JLP Timeline <br /> - Phase I RWSP (water demand) complete September 2011 <br /> - Phase II RWSP (supply alternatives) with modeling and analysis complete March 2012 <br /> - Final RWSP complete April 2012 <br /> - Phase I Interconnections Study complete September 2011 <br /> - Phase II Interconnections Study complete October 2011 <br /> - JLP consultant (?) completes JL Allocation Applications - February through August <br /> 2012 <br /> Regional Population Estimate—population will double in the next 30 years <br /> JLP Phase I RWSP <br /> - Water Demand Projections developed by Planning in three Urban Transition Areas <br /> including Economic Development District (EDD) zones <br /> o Land use analysis used to develop projections <br /> 0 2040 demands will be used by DWR in allocation process: <br /> Eno 0.534 MGD <br /> Hillsborough Area 0.695 MGD <br /> Buckhorn 1.195 MGD <br /> (Including Orange County's Efland and Mebane zones) <br /> Total: 2.424 MGD <br /> Level 1 vs Level 2 Allocation Costs <br /> Phase II RWSP will include evaluation of supply alternatives <br /> Interconnections Study <br /> - Draft report underway <br /> o Includes locations of planned and proposed regional interconnections <br /> o Participants <br /> o Demand <br /> o System Interconnections <br /> o Design <br /> o Location <br /> o Agreements <br /> - Feasibility study will be completed this fall. <br /> Interlocal Agreements <br /> Durham - water and sewer service in Eno EDD <br /> Mebane — expanded Buckhorn service area? <br /> Hillsborough —forthcoming <br /> WASMPBA — Does language need to be modified? <br /> Additional Item <br />