Browse
Search
Agenda - 09-20-2011 - 8b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 09-20-2011
>
Agenda - 09-20-2011 - 8b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2011 9:45:06 AM
Creation date
9/16/2011 9:45:01 AM
Metadata
Fields
Template:
BOCC
Date
9/20/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8b
Document Relationships
2011-421 Planning - City of Durham - Interlocal Agreement for construction, operation of Water & Sewer Facilities in Eno EDD
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2011
Minutes 09-20-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 3 <br />In accordance with Section 7 of the interlocal agreement the following fees will still be <br />collected by the City of Durham, some (frontage and acreage charges) of which will be <br />considered as `Dedicated Receipts' towards payment of agreed to infrastructure in the <br />specified grange County area. <br />City of 1]urham <br />I. Water and Sanitary Sewer Charges: <br />A_ frontage Charges: <br />These fees are applicable when property is developed and a water and/or <br />sanitary sewer line has not been installed by the developer of property <br />owner across the street frontage or street right-nf-way abutting the project. <br />These fees are paid when the mains are extended for new projects. If no <br />extension- is made frontage charges are paid with the application for <br />service. The rates below are effective since May 1, 2010. <br />The current frontage charges are: 1/Vater Sewer <br />Sanitary <br />Inside Ci#y Limits $27.00/LF $50.00/LF <br />Outside City Limits $29.50/LF $56.00/LF <br />B. Capital Facility Fees: <br />Are due prior to connection. Typically, these fees are paid with the <br />application for the service connection. The fees below are required per <br />Section 23-40.1 of the Ordinance and shall be in full force and effect-of <br />September 1, 2010. <br />The current capital facility fees are: <br />Meter Size Water Sanitary Sewer Total <br />(inches} <br />5/8 $1,524 $ 915 $ 2,439 <br />(e.g. typical single family) <br />1 'h $6, 571 $4, 573 $11,.144 <br />(e.g. 24,000 light industrial} <br />C. Meter and Service Charges **: <br />Meter Size Pick-Up Installed by Oity <br />(inches) <br />5/8 N/A $ 80.00 <br />1 '/2 $154.00 $215.00 <br />18 <br />*Note: For infill lots and single lot developments call Engineering Services for <br />information on City installed Water and Sanitary Sewer Services. <br />
The URL can be used to link to this page
Your browser does not support the video tag.