Browse
Search
2011-287 AMS - H. M. Kern Corp. for Change Order #6 for Health Dept. Renovations at Whitted Bldg. (Revised)
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-287 AMS - H. M. Kern Corp. for Change Order #6 for Health Dept. Renovations at Whitted Bldg. (Revised)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2018 9:42:48 AM
Creation date
9/7/2011 11:22:05 AM
Metadata
Fields
Template:
Contract
Date
8/1/2011
Contract Starting Date
2/16/2011
Contract Ending Date
8/28/2011
Contract Document Type
Contract Amendment
Amount
$1,071,924.00
Document Relationships
Agenda - 08-23-2011 - 8c
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2011\Agenda - 08-23-2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Changes Proposal Request <br /> PROJECT: PROPOSAL REQUEST NUMBER: 004 revised <br /> Orange County Health Department <br /> Renovations DATE OF ISSUANCE: 05/04/2011 <br /> 300 West Tryon Street <br /> Hillsborough, NC 27278 CONTRACT FOR: General Construction <br /> OWNER: CONTRACT DATE: 02/16/2011 <br /> Orange County <br /> 101 West Margaret Lane ARCHITECT'S PROJECT NUMBER: 1001 <br /> Hillsborough, NC <br /> FROM ARCHITECT: <br /> Corley Redfoot Zack, Inc, <br /> P.O.Box 2368 <br /> Chapel Hill,NC 27515 <br /> TO CONTRACTOR: <br /> H. M. Kern Corporation <br /> P.O. Box 19424 <br /> Greensboro, NC 27419 <br /> Please submit an itemized proposal for changes in the Contract Sum and Contract Time for proposed <br /> modifications to the Contract Documents described herein. Within ten(10)days,the Contractor must <br /> submit this proposal or notify the Architect,in writing, of the date on which proposal submission is <br /> anticipated. <br /> THIS IS NOT A CHANGE ORDER,A FIELD ORDER OR A DIRECTION TO PROCEED WITH THE WORK <br /> DESCRIBED IN PROPOSED MODIFICATIONS. <br /> DESCRIPTION: <br /> Make the following revisions to the Work: <br /> • Add two(2)Toilets on 2nd Floor,as shown in attached Sketches. <br /> o Toilet partitions shall be overhead-braced phenolic-core panels. Available <br /> manufacturers include, but are not limited to,the following: <br /> • American Sanitary Partition Co. <br /> • Ampco. <br /> • Global Partitions. <br /> • Partition Systems. <br /> • Rockville Partitions. <br /> • Remove Vestibule at entrance to 2nd Floor Conference Room, <br /> o Add millwork with sink and undercounter icemaker on West wall of Conference Room. <br /> (Icemaker to be provided by Owner.) <br /> o Provide power for residential refrigerator. (Refrigerator to be provided by Owner.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.