Browse
Search
2011-287 AMS - H. M. Kern Corp. for Change Order #6 for Health Dept. Renovations at Whitted Bldg. (Revised)
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-287 AMS - H. M. Kern Corp. for Change Order #6 for Health Dept. Renovations at Whitted Bldg. (Revised)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2018 9:42:48 AM
Creation date
9/7/2011 11:22:05 AM
Metadata
Fields
Template:
Contract
Date
8/1/2011
Contract Starting Date
2/16/2011
Contract Ending Date
8/28/2011
Contract Document Type
Contract Amendment
Amount
$1,071,924.00
Document Relationships
Agenda - 08-23-2011 - 8c
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2011\Agenda - 08-23-2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TM <br /> Document G701 - 2001 <br /> Change Order <br /> PROJECT:(Name and address) CHANGE ORDER NUMBER: 006 (Revised) OWNER❑ <br /> Orange Co. Healt'n Dept. Renov.DATE: %ugus t 1' 2011 ARCHITECT El L. WI-dtted Bldg <br /> Ilillsborough, NC ARCHITECT'S PROJECT NUMBER 1001 CONTRACTOR❑ <br /> TO CONTRACTOR:(Name and address) FIELD ❑ <br /> H. M. Kern Corp. CONTRACT DATE: February 16, 2011 OTHER❑ <br /> 160 Thatcher Road <br /> Greesnboro, NC 27409 CONTRACT FOR: General Construction <br /> The Contract is changed as follows: <br /> (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) <br /> 01me-r-requested PM-09R: 2nd floor toilet/classroorl . .. . . .. .. .ADD $30,724.00 <br /> The original(Contract Sum)(Gt { ice)was $ 7(1-3,800.00 <br /> The net change by previously authorized Change Orders $ 277,400 00 <br /> The(Contract Sum) prior to this Change Order was $ 1 0441 ,200.00 <br /> The(Contract Sum)(falcat%fbi&baxmA97ce)will be(increased)f <br /> by this Change Order in the amount of $ 30X724.00 <br /> The new(Contract Sum) , , itce)including this Change Order will be $ ]y�j 924.00 <br /> The Contract Time will be ed)(unchanged)" ( )days <br /> The date of Substantial Completion as of the date of this Change Order therefore is August 28, 2011. <br /> (Note: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price <br /> which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the <br /> Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.) <br /> NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER. <br /> Corley Redfoot Zack, Inc_. H. M. Kern Corp. Orange Co ., NC <br /> ARCHITECT(Firm name) CONTRACTOR(Finn name) OWNER(Finn name) <br /> 222 Cloister Court 160 Thatcher Road p0 Box 8181 <br /> �iDt41 Hill, 27514 Greensboro.7_7514 Greensbor��27409 Ni 11 sbo 9- <br /> AD E ADDR S ADDRESS <br /> (Si re BY(Signature) /' BY( n tore <br /> Kenneth F. Redfoot AIA 4�Ei Z!42 (mil i C Ha Re 14 <br /> (Typed name) (Typed name) (I'ped name) <br /> r'?//L-,Z,all <br /> DATE DATE DATE <br /> CAUTION: You should sign an original AIA Contract Document,on which this text appears in RED.An original assures that <br /> changes will not be obscured. <br /> AIA Document G701 TM—2001.Copyright @ 1979,1987,2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING:This <br /> AIA® Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this A10 Document, <br /> or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. <br /> Purchasers are permitted to reproduce ten(10)copies of this document when completed.To report copyright violations of AIA Contract Documents,e-mail <br /> The American Institute of Architects'legal counsel,copyright @aia.org. <br />
The URL can be used to link to this page
Your browser does not support the video tag.