Browse
Search
2011-286 AMS - H. M. Kern Corp. for Change Order #5 for Health Dept. Renovations at Whitted Bldg. (Revised)
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-286 AMS - H. M. Kern Corp. for Change Order #5 for Health Dept. Renovations at Whitted Bldg. (Revised)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2018 9:41:58 AM
Creation date
9/7/2011 11:18:47 AM
Metadata
Fields
Template:
Contract
Date
8/23/2011
Contract Starting Date
2/16/2011
Contract Ending Date
8/28/2011
Contract Document Type
Contract Amendment
Amount
$1,041,200.00
Document Relationships
Agenda - 08-23-2011 - 8c
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2011\Agenda - 08-23-2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Drawing A1.5: Revise Door and Frame Schedule to change Doors 110D and 120, as follows: <br /> o 3'-0" by 7'-0"Type E,full glass wood door,as shown on Sketch SDA-003. <br /> • Drawing M1.1: Refer to attached Sketch SKM-7. <br /> o Shift supply and return diffusers in Storage 141 to match revised layout. <br /> o Shift SS-113 to new IT Room 140 location. <br /> o Add supply and return diffusers in Telephone Closet 140A. <br /> o Relocate existing T-Stat to Telephone Closet 140A. <br /> ATTACHMENTS: <br /> Sketch SDA-001(rev 3/2/11),SKM-7 <br /> REQUESTED BY THE ARCHITECT: <br /> 14 4 %—� <br /> t IV <br /> David L. Browne,AIA CSI CCS LEED AP <br /> Project Architect <br /> X OWNER X ARCHITECT X CONSULTANT X CONTRACTOR X FIELD X OTHER(inspections) <br />
The URL can be used to link to this page
Your browser does not support the video tag.