Browse
Search
2011-286 AMS - H. M. Kern Corp. for Change Order #5 for Health Dept. Renovations at Whitted Bldg. (Revised)
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-286 AMS - H. M. Kern Corp. for Change Order #5 for Health Dept. Renovations at Whitted Bldg. (Revised)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2018 9:41:58 AM
Creation date
9/7/2011 11:18:47 AM
Metadata
Fields
Template:
Contract
Date
8/23/2011
Contract Starting Date
2/16/2011
Contract Ending Date
8/28/2011
Contract Document Type
Contract Amendment
Amount
$1,041,200.00
Document Relationships
Agenda - 08-23-2011 - 8c
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2011\Agenda - 08-23-2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Changes Proposal Request <br /> PROJECT: PROPOSAL REQUEST NUMBER: 003 <br /> Orange County Health Department <br /> Renovations DATE OF ISSUANCE: 04/21/2011 <br /> 300 West Tryon Street <br /> Hillsborough, NC 27278 CONTRACT FOR: General Construction <br /> OWNER: CONTRACT DATE: 02/16/2011 <br /> Orange County <br /> 101 West Margaret Lane ARCHITECT'S PROJECT NUMBER: 1001 <br /> Hillsborough, NC <br /> FROM ARCHITECT: <br /> Corley Redfoot Zack, Inc, <br /> P.O. Box 2368 <br /> Chapel Hill,NC 27515 <br /> TO CONTRACTOR: <br /> H. M. Kern Corporation <br /> P.O. Box 19424 <br /> Greensboro, NC 27419 <br /> Please submit an itemized proposal for changes in the Contract Sum and Contract Time for proposed <br /> modifications to the Contract Documents described herein. Within ten(10)days,the Contractor must <br /> submit this proposal or notify the Architect, in writing,of the date on which proposal submission is <br /> anticipated. <br /> THIS IS NOT A CHANGE ORDER,A FIELD ORDER OR A DIRECTION TO PROCEED WITH THE WORK <br /> DESCRIBED IN PROPOSED MODIFICATIONS. <br /> DESCRIPTION: <br /> Make the following revisions to the Work: <br /> • Drawings A1.2 &A1.23: <br /> • Subdivide Storage 146 to create Telephone Closet 140A as shown in attached Sketch <br /> SDA-001, revised 3/2/11. <br /> • Cut masonry opening and install new Door 134F. <br /> • Drawing A1.5: Revise Door and Frame Schedule to add new Door 134F,as follows: <br /> • 3'-0" by 7'-0"Type A,solid core wood door. <br /> • Hollow metal frame. <br /> • Hardware: <br /> 3 Hinges 5131314-1/2 x 4-1/2 <br /> 1 Lockset ML2057 LWA M21 <br /> 1 Closer 4011 REG <br /> 1 Kickplate 840010"X 34" <br /> 3 Door Silencers GJ64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.