Browse
Search
2011-286 AMS - H. M. Kern Corp. for Change Order #5 for Health Dept. Renovations at Whitted Bldg. (Revised)
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-286 AMS - H. M. Kern Corp. for Change Order #5 for Health Dept. Renovations at Whitted Bldg. (Revised)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2018 9:41:58 AM
Creation date
9/7/2011 11:18:47 AM
Metadata
Fields
Template:
Contract
Date
8/23/2011
Contract Starting Date
2/16/2011
Contract Ending Date
8/28/2011
Contract Document Type
Contract Amendment
Amount
$1,041,200.00
Document Relationships
Agenda - 08-23-2011 - 8c
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2011\Agenda - 08-23-2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H. M.Kern Corporation PCO-08 5/20/2011 <br /> Job#759 ORANGE COUNTY HEALTH DEPARTMENT RENOVATIONS <br /> RFP#003 668-3213(p <br /> 668-2142(f) <br /> Phase Descri tiara Qtv unit unit Amount <br /> Labor: <br /> 20110 COORDINATION 16 HRS 19.00 304 <br /> 20210 CUT DOOR OPENING 16 HRS 15.00 240 <br /> 208101 INSTALL FRAME, DOOR, HARDWARE 16 HRS 15.00 240 <br /> 20180 CLEAN UP 4 HRS 15.00 60 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 0.001 0 <br /> 0 0.00 0 <br /> Total Labor 844 <br /> Materials: <br /> 30610 N-C PLYWOOD 3 SHTS 61.00 183 <br /> 30198 DUMP FEES 1 US 250.00 250 <br /> 50810 DOOR&ACCESSORIES 1 US 805.00 805 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 1 0.00 0 <br /> Total Materials 1,238 <br /> Equipment: <br /> 10153 DEMO TOOLS 1 US 150.00 150 <br /> 30500 STEEL LENTIL 1 EA 350.00 350 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 01 0.00 0 <br /> 0 0.00 0 <br /> Total Equipment 500 <br /> Subcontractors: <br /> S 4348.59 4 <br /> 41520 HVAC 1 U 349, <br /> 40920 DRYWALL 1 US 339.00 339 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> Total Subcontractors 4,688 <br /> Total Labor, Materials&Equipment 2,582 <br /> Sales Tax Materials&Equipment) 7.75% 135 <br /> 29160 Labor Burden 40% 338 <br /> Subtotal 3,055 <br /> 89800 OH& Profit(Labor, Materials & Equipment) 20% 611 <br /> Total Subcontractors L4,6881 89800 OH &Profit Subcontractors) 10%Subtotal 62050 Performance&Payment Bond 2%Total Proposed Change Order <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.