Browse
Search
2011-286 AMS - H. M. Kern Corp. for Change Order #5 for Health Dept. Renovations at Whitted Bldg. (Revised)
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-286 AMS - H. M. Kern Corp. for Change Order #5 for Health Dept. Renovations at Whitted Bldg. (Revised)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2018 9:41:58 AM
Creation date
9/7/2011 11:18:47 AM
Metadata
Fields
Template:
Contract
Date
8/23/2011
Contract Starting Date
2/16/2011
Contract Ending Date
8/28/2011
Contract Document Type
Contract Amendment
Amount
$1,041,200.00
Document Relationships
Agenda - 08-23-2011 - 8c
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2011\Agenda - 08-23-2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
harry jensen <br /> From: Wayne Sherman [wsherman@co.orange.nc.us] <br /> Sent: Monday, May 16, 2011 9:58 AM <br /> To: hjensen @corleyredfootzack.com <br /> Subject: FW: Revision to RFP-004-added 2nd fl chgs+colors&floor finishes-Medintech <br /> Attachments: 2nd floor requst 0001.pdf <br /> Harry, <br /> This is the e-mail I think you were looking for per your voice mail this morning. It has the breakdown of choices for <br /> flooring, etc. <br /> Wayne <br /> From: Rosemary Summers <br /> Sent: Thursday, April 21, 20112:16 PM <br /> To: 'harry jensen' <br /> Cc: Jeff Thompson; Wayne Sherman; KEN REDFOOT; 'Dave Browne' <br /> Subject: RE: Revision to RFP-004-Conference Room casework relocation <br /> Harry, <br /> This is in follow up to our meeting Tuesday. Sorry it has taken me so long to get to this. <br /> I am also requesting the following for the second floor A Building <br /> 1)addition of a standard ice maker under the counter next to the sink in the 2nd floor conference room <br /> 2)opening the wall with the widest cased opening possible between the office immediately to the west of the new <br /> bathroom closest to the south wall. It's fine to leave both office doors. See attachment with note on Option #1 additional <br /> sketch <br /> 3)electrical service and computer connections in the ceiling of both the classroom and the conference room for a ceiling <br /> mounted LCD projector(second floor A Building) <br /> B Building <br /> Please note for the B Building that there will need to be plumbing and a dryer vent next to the break room on the ground <br /> floor for a home sized washer and dryer. <br /> Also please ensure that the plans for the B Building dental mechanical room have extra sound baffling/absorption for the <br /> larger equipment that will be in that space. <br /> As requested, please find our materials and color selections for floors and countertop laminate. <br /> Rubber the in A Building ground floor hall replacement: Texture: Crackle Design type 982; Colors: 174 (Smoke) and 187 <br /> (Blue) in a pattern lay out similar to that of the current halls. Base/Shoe Mold: color 187 (blue). <br /> All Offices, Medical Records, Break Room,Waiting Room, workroom, and the main portion of the clinic <br /> vinyl mondo smooth HAS 85 (light blue) <br /> base/shoe mold: Roppe RubberNinyl 154(Salem Blue) <br /> All Counter tops S3036T Textured (Impressionist Blue) <br /> Medentec in all interview rooms, exam rooms, laboratory, pharmacy, and bathrooms in clinic space, <br /> 2nd floor A Building all offices, classroom and conference room in 70145 Patina carpet. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.