Browse
Search
2011-279 ES - Eaton Corporation for UPS Service Renewal
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-279 ES - Eaton Corporation for UPS Service Renewal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2018 9:35:40 AM
Creation date
9/1/2011 4:03:23 PM
Metadata
Fields
Template:
Contract
Date
9/1/2011
Contract Starting Date
10/1/2011
Contract Ending Date
9/30/2012
Contract Document Type
Agreement - Services
Amount
$6,035.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FA,kT*N <br /> Powering Business Worldwide <br /> 4. Environmental Parameters <br /> a. UPS area ambient temperature and condition of ventilating equipment <br /> b. General Cleanliness of UPS Power Module 4 <br /> c. General Cleanliness of UPS area <br /> d. Replace all air filters <br /> e. Clean control panel/CRT screen <br /> f. Flywheel only: Drain oil and change oil and filters NOTE:One(1)oil and filter change <br /> per year. <br /> 6. Battery Cabinet Checks <br /> a. General appearance of Battery System(all types) <br /> b. General cleanliness of Battery System area(all types) <br /> c. Inspect cells for physical abnormalities <br /> d. Inspect all DC connections for abnormalities <br /> e. Battery System area ambient temperature and condition of ventilating equipment <br /> f. For internal batteries only, measure and record: <br /> i. Overall battery float voltage <br /> fl. Charger output current and voltage <br /> Negative terminal temperature of one cell/battery per battery cabinet shelf or rack <br /> tier <br /> 6. Monitoring System Parameters <br /> a. Alarm archive review and printing <br /> b. Alarm lamp test-local and remote (if applicable) <br /> c. Replace all open monitor bulbs <br /> d. If work is completed under a PowerTrust Ultra contract, inspect battery monitoring system <br /> e. Review Battery Test in history(if applicable) <br /> 7. General <br /> a. Customer Consultation <br /> b. Verbal Recommendations <br /> c. General Observations <br /> Following the Preventive Maintenance inspection, a written report will be provided detailing the results of <br /> the inspection, and making specific recommendations toward future remedial action, upgrades, or <br /> sparing. <br /> Eaton and PowerTrust are trade names,trademarks,and/or service marks of Eaton Corporation or its subsidiaries and affiliates. <br /> Scope of Work Attachment R-2 <br /> Revision 4/10 <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.