Browse
Search
Agenda - 08-23-2011 - 8c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 08-23-2011
>
Agenda - 08-23-2011 - 8c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2012 12:41:39 PM
Creation date
8/31/2011 12:15:47 PM
Metadata
Fields
Template:
BOCC
Date
8/23/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8c
Document Relationships
2011-286 AMS - H. M. Kern Corp. for Change Order #5 for Health Dept. Renovations at Whitted Bldg. (Revised)
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2011
2011-287 AMS - H. M. Kern Corp. for Change Order #6 for Health Dept. Renovations at Whitted Bldg. (Revised)
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2011
2011-288 AMS - H. M. Kern Corp. for Change Order #7 for Health Dept. Renovations at Whitted Bldg.
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2011
2011-291 AMS - J. F. Wilkerson Contracting Company for contract work for Efland Sewer
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2011
Minutes 08-23-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
ORD-2011-027 Central Efland - Northern Buckhorn Sewer Extensions – Funding (Including Budget Amendment #1-A) Bid Award and Construction
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2011
RES-2011-077 Resolution of Award to J. F. Wilkerson Contracting Co., Inc. for the Efland Buckhorn Sewer
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'ISt WEST MAIN STREET <br />DURHAM, NORTH CA.ROL_4NA 277t1k <br />p819.5.820.358 t4F8.B 88.fr546 <br />F •a Pl G't Efl$ i4~P $~"i6 4`R%t6.1F4_ <br />ADDENDUM NO 2 <br />.TUNE >s, zoll! <br />PROJECT NAME -SANITARY SEWER IMPROVEMENTS FOR BUCKHORN AREA - <br />NORTH OF I-85 AND EFLAND COMMUN:[T'Y <br />OWNER -ORANGE COUNTY <br />ENGINEER - COLZTER JEWELL TI-1AMES, P.A. <br />This addend.una becomes part of the Contract Documents and modifies the original Bid <br />Documents dated January ~7, 2011. Bidders .shall re~Jiew the addendum and incorporate ttge <br />modified requirerrtents into their proposals. <br />The Bidder is required to sign and return a cagy of this :addendum with the 'Bid, and-to <br />acknowledge receipt of this Addendum in the space provided on the front page of the Bid. Farm. <br />I . It is not necessary to write out alt unit prices in v~ards. ``Unit free" and "'T'otal" entries <br />are required for atl line items in the Bid. <br />2. This Project is not subject to "Buy America" requirements. <br />3. The required form for the Iti(C[~OT .Bond is attached to this Addendwn. <br />4. The following language is incorporated into this Project as additions to the General <br />Conditions or the Contract, as appropriate; <br />Suppicmental General Conditions <br />1.02 '~ermiraoto~y°. <br />B. Day: Time extensions w'sl{ not be granted for rain, wind, snow or other natural phenomena of <br />normal intensity-for the locality where work is performed. Far purpose of determining extent of <br />delay attributable to unusual weather phenomena, a determination shall be made by cornparing <br />the weather for the contract period involved with the average of the preceding five [5) year <br />climatic range during the same time interval based on the National Oceanic and Atmospheric <br />Administration National Weather Service statistics for the locality where wank is performed and on <br />daily weather togs kept on the job site by the contractor reflecting the effect of the weather on <br />progress of the work and initialed by the. designer's [or contract administrator's] representative. <br />Time extensions far weather delays do not entitle the contr4actor to °extended overhead" <br />recovery.. <br />E N G I FV E E Fi ( N G P~ A !~! N I M 6- L A N D S G A P~ A R C H I T E C T U R E <br />
The URL can be used to link to this page
Your browser does not support the video tag.