37 <br />Page 3 <br />• Important Points <br />o Review ALL BID DOCUMENTS - they are the CON'T'RACT <br />DOCUMENTS <br />o Liquidated Damages are $800 per day if Pzoject is late <br />o Sequence of Construction - Buclrhorn must begin first, and continue to <br />completion. Efland may begin before the completion of Buckhorn, but <br />must not impede the completion of Buckhorn <br />o Erosion Control requirements are shown on the Plans -Include 10 Day <br />Requirement to stabilize disturbed areas <br />o Maintain Water/Sewez Separations -exposing existing utilities in advance <br />is required to insure separations <br />o Detailed Descriptions of Pay Items <br />o Buckhorn is in the Mebane sewer system -Mebane will participate in <br />inspections and approvals <br />o Efland is in the Orange County sewer system -Orange County will . <br />participate in the inspections and approvals <br />o Sanitary Sewer Connection Details are critical -must be constructed to <br />provide gravity service as shown - minimum grade from connecting "Y" <br />is required - services cross roads with bores {not open cut) <br />o Force Main installation is critical - as shown to avoid air pockets <br />o Change Orders must be initiated. as soon as possible to accommodate the <br />approval process through CdT, Construction Grants & Loans, and Orange <br />County <br />+ Other Comucnents <br />• Questions <br />• Close <br />