Browse
Search
Policy - No Fault Well Repair Fund Policy
OrangeCountyNC
>
Board of County Commissioners
>
Policies
>
2002
>
Policy - No Fault Well Repair Fund Policy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 9:49:34 AM
Creation date
8/30/2011 9:49:31 AM
Metadata
Fields
Template:
BOCC
Date
2/19/2002
Meeting Type
Regular Meeting
Document Type
Others
Agenda Item
10a
Document Relationships
Agenda - 02-19-2002-10a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2002\Agenda - 02-19-2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
io <br />R W A TF.R [1T T A T ,TTV PR (1RT ,F,M4 <br /> <br /> Process Steus Response Time Guidelines <br />i. Environmental Health. Division (OCHD) receives request from N/A <br /> resident directl or throu h another a enc . <br />ii. OCHD contacts American Stone and advises them of ;the Contact made within 2 business <br /> request and the nature of the request. No action is required by days of request. <br /> American Stone at this oint. <br />iii. OCHD staff collects water samples for analysis at the State <br /> Laboratory of Public Health. Depending on the samples results, First samples collected by OCHD <br /> additional sampling may be necessary to fully assess the within 10 business days of <br /> problem. [NOTE: The timing of water sample results is not request. <br /> under control of OCHD or Orange County. Results of most <br /> sam les are returned within 2-3 weeks . <br /> OCHD confirms or denies well <br />iv. Based on the water sample results, OCHD staff will: failure claim within 5 business <br /> a. Confirm a well failure exists; or days of receipt of the final sample <br /> b. Deny the well failure claim; or results. OCHD also ..notifies <br /> c. Recommend further study of the well American Stone within the 5 <br /> business day period once a well <br /> OCDH notifies American Stone if a well failure exists. failure is confirmed. <br />v. American Stone consultant visits site and determines whether Consultant visits site within 10 <br /> the well failure is a "probable result" of the quarry activity and business days of request. <br /> re orts findin s to OCHD. <br />vi. If the consultant finds that the failure is a "probable result" of N/A <br /> the o eration, no further action is necess b OCHD. <br />vii. For well failures that are not a probable result of the quarry <br /> operation, OCHD staff recommends: Strategy recommended and <br /> a. A remediation strategy - an authorized Orange County contractor is contacted within 10 <br /> representative contacts the appropriate contractor(s). (Go to business days of receipt of final <br /> step ix); or sample results or after results of <br /> b. Further study by a private consultant to determine the best further study are complete. <br /> remediation strate <br />viii. Private consultant completes study and reports to OCHD (Go Depends on consultant schedule <br /> back to st vii.-a. <br />ix. Remediation strategy is effected Depends on contractor schedule <br /> Appeals shall be made within 30 <br /> days of the issuance of a claim <br /> denial based on the finding that <br /> no well failure exists or other <br />x. Appeals by the residents to the Board of Health finding unsatisfactory to the <br /> resident. Once made, appeals <br /> progress according to the Board <br /> of Health Polic on a eals. <br />
The URL can be used to link to this page
Your browser does not support the video tag.