Browse
Search
Policy - No Fault Well Repair Fund Policy
OrangeCountyNC
>
Board of County Commissioners
>
Policies
>
2002
>
Policy - No Fault Well Repair Fund Policy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 9:49:34 AM
Creation date
8/30/2011 9:49:31 AM
Metadata
Fields
Template:
BOCC
Date
2/19/2002
Meeting Type
Regular Meeting
Document Type
Others
Agenda Item
10a
Document Relationships
Agenda - 02-19-2002-10a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2002\Agenda - 02-19-2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />WELL FAILURE DETERMINATION PROCEDURES <br />ualit <br />1. The homeowner or resident notifies the County of the problems they are <br />experiencing with their well. The information given should be as specific <br />and detailed as possible in regards to the problems they have and the <br />history of those problems. <br />2. The Health Department will conduct bacteriological and inorganic chemical <br />water samples. Other types of samples may be collected, depending on the <br />specifics of the complaint. <br />3. If the sample results indicates there is a well failure, the Health Department <br />will notify ASC so their expert can visit the site to complete the probable <br />result assessment. <br />4. ASC's "qualified expert" visits the site and perform diagnostic. procedures to <br />evaluate whether the quality problems are a probable result of the quarry <br />operations. <br />5. The expert shall prepare a report of their findings for review and reference <br />in further handling of the matters. <br />6. If there is a determination that a well failure exists and is a probable result <br />of the quarry operation, ASC is responsible for remediation of the situation. <br />7. If the probable result determination is negative, the expert will refer the <br />situation back to the County for renovation, repair, treatment system, or <br />replacement through the NFWRF. <br />uantit <br />1. The homeowner or resident notifies the County of the problems they are <br />experiencing with their well. The information given should be as specific <br />and detailed- as possible in regards to the problems they have and the <br />history of those problems. <br />2. The County will notify ASC <br />3. ASC will have a "qualified expert" visit the site and perform diagnostic <br />procedures to evaluate whether there is a defined well failure in terms of <br />well water quantity. <br />4. The expert shall prepare a report of their findings for review and reference <br />in further handling of the matters. <br />5. If there is a determination that a well failure exists and is a probable result <br />of the quarry operation, the well will be renovated, repaired or replaced by <br />ASC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.