Orange County NC Website
<br />DRAFT-d3/1U20ll ____ Triangle Regional ~'Vater Supply Plan <br />From SECTION.XI. INDIVIDUAL SYSTEM SUMMARIES <br />Orange Covnty <br />Prior Studies/ Relate-d Documentation <br />Orange County, 2008. Orange County, North Carolina: 2030 Comprehensive Plan. Orange County <br />Planning and Inspections Department. Adopted 18 Nov 2008. Ch. 5 Land Use Element. <br />Orange County, 2008. Orange County, North Carolina: 2030 Comprehensive Flan. Orange County <br />Planning and Inspections Department. Adapted 18 Nov 2008. Ch. 8 Services and Facilities Element, <br />including Figure 8-1 Water and Sewer Management, Planning and Boundary Agreement. <br />Future Demand <br />Table 41. Oranne County Future Demand Projections (MGD). <br />Sector 2010 2020 2030 2040 2050 2060 <br />Residential 0.01 0:26 0.59 0.90- 1.19 _ 1.46 <br />Non-Residential 0.01 0.39 -0.89 1.35 1.79 2.19 <br /> <br />WTP Process (N/A) (Orange does not operate a WTP. All water will be <br /> <br />provided by other systems.) <br />Distribution Process {Included with Other Non-Revenue)...;, <br />Other Non Revenue 0.00 0.05' 0.11 0.17 0.22 0.27 <br />Total 0.02 0.70 1.59 2.42 3.20 3.92 <br />Table 42.Oran e Coun Future_ Demand Pro' ections ( ercent of total demand . <br />Sector 2010 2020- - 2030 2040 2050 2060 <br />Residential 37.2% 37.2% 37.2% 37.2% 37.2% 37.2% <br />Non-Residential 55.8% 55.8% 55.8% 55.8% 55.8% 55.8% <br />WTP Process (N/A) {Orange does'not operate a WTP. All water will'be <br />provided by other systems.) <br />Distribution Process (Included with Other Non-Revenue) <br />:Other Non.-Revenue 7.0% 7.0% 7.0°~ 7.0% 7.0% 7.0% <br />Total 100% 100% 100% 100 100% 100% <br />Demand Methodology <br />-Orange County does not currently operate a water system and does not have plans to operate asystem in <br />the future. Nevertheless, the County has significant areas identified in their Comprehensive Plan for <br />future economic development and is committed to ensuring adequate water supplies will be available for <br />these areas. The County is planning to partner with neighboring water systems to serve these areas, but <br />plans to do so have not been finalized as of yet. It is likely that a combination of Mebane, Orange- <br />Alamance, Hillsborough and the Durham water systems will ultimately provide service to areas of the <br />County. Without the benefit of having historical customer usage information to base future demand <br />projection information on, Orange County has instead used a planning approach to estimate water <br />demand. <br />s <br />Page 1 <br />