Browse
Search
Agenda - 08-30-2011 - 1a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 08-30-2011
>
Agenda - 08-30-2011 - 1a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2011 4:16:09 PM
Creation date
8/26/2011 4:16:06 PM
Metadata
Fields
Template:
BOCC
Date
8/30/2011
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
1a
Document Relationships
Minutes 08-30-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Draft Supply Alternatives from t'hase II RWSP <br />Future <br />Source <br />Source Name Year Yield Develop. financial Environ. Regulatory/ <br /># Online (MGD) Time (yrs) Cost Impact Political <br /> Existing 1 MGD Jordan Labe allocation treated/ <br />1 supplied by regional partner (Haw River basin) 2019 1.0 8 M L M <br /> Increase JL allocation to 2 MGD - <br />2 treated/supplied by regional partner (Haw) 2027 2.0 16 M L M <br />3 Same scenario increased to 4 MGD (Haw) X036 4.Q 25 M L M <br /> ase finished water from utility as needed <br />4 Havh <br />( ) 2009 0.5 5 M L M <br /> <br />5 Purchase finished water from utility as needed <br />2018 <br />2 <br />0 <br />7 <br />M <br />L <br />M <br /> (Haw) . <br />6 hase finished water from utility as needed <br />Ha 2029 4 <br />0 18 M L M <br /> N <br />( ) . <br /> Purchase finished water from utility as needed <br />7 <br />(Neuse) 2020 1.0 9 M L M <br />8 Purchase finished water from utility as needed 2029 2 <br />0 18 M L M <br /> (Neuse) . <br /> New reservoir with regional partner (Either <br />9 , <br />basin) 2036 4.0 25 H H H <br />10 Orange County reservoir (Either basin) 2036 ? 25 H H H <br />Combinations of the above listed alternatives were used to meet projected demand and are included in draft <br />~- <br />L <br />Phase II RWSP. j <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.