37 <br />Page 3 <br />• Important Points <br />o Review ALL BID DOCUMENTS — they are the CONTRACT <br />DOCUMENTS <br />• Liquidated Damages are $800 per day if Project is late <br />• Sequence of Construction — Buckhom must begin first, and continue to <br />completion. Efland may begin before the completion of Buckhorn, but <br />must not impede the completion of Buckhorn <br />• Erosion Control requirements are shown on the Plans — Include 10 Day <br />Requirement to stabilize disturbed areas <br />• Maintain Water /Sewer Separations — exposing existing utilities in advance <br />is required to insure separations <br />• Detailed Descriptions of Pay Items ' <br />• Buckhorn is in the Mebane sewer system-- Mebane will participate in <br />inspections and approvals <br />• Efland is in the Orange County sewer system — Orange County will . <br />participate in the inspections and approvals <br />• -Sanitary Sewer Connection Details are critical — must be constructed to <br />provide gravity service as shown —minimum grade7 from connecting "Y" <br />is required — service's cross roads with bores (not open qrt) <br />• Force Mak installation is critical — as shown to avoid airpockets <br />• Change Orders must be initiated as soon as possible to accommodate the <br />approval process through CJT, Construction C3rants & Loans, and Orange <br />County <br />• Other Comments <br />• Questions- <br />0 Close <br />