Browse
Search
ORD-2011-027 Central Efland - Northern Buckhorn Sewer Extensions – Funding (Including Budget Amendment #1-A) Bid Award and Construction
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2010-2019
>
2011
>
ORD-2011-027 Central Efland - Northern Buckhorn Sewer Extensions – Funding (Including Budget Amendment #1-A) Bid Award and Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2019 3:11:35 PM
Creation date
8/24/2011 4:33:13 PM
Metadata
Fields
Template:
BOCC
Date
8/23/2011
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
8c
Document Relationships
Agenda - 08-23-2011 - 8c
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2011\Agenda - 08-23-2011
Minutes 08-23-2011
(Attachment)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m A Federal agency, but only as a subreofpfent under' an -award or subaward to a non - Federal <br />en*- <br />4. Subaward: <br />a. This terra means a legatinstnumenl:.6o provide support for the performance of any portion of-the <br />substantfire project or program for which you reoelved this award and that you as tfwedgent award to an sQglbie� <br />scutxecpter>t. <br />b. The therm does not fnclhOs yow procurement of- property and services needed -to carryout—the projector <br />program (fgr furrier snfarnation, see Sea –.210 of the - attachment to OMB Circular A 133, "Audits of States, Local <br />Government% and Won-Profit Organization*. <br />m A subavvard maybe provided throu_*arry legal agreement; Including an agreement that you consider a <br />Contract <br />SU*x4p lent means arreatity that <br />a. Receives a subaward from you under this award; and <br />-b. Is acomintebfa -to your for the uss 4 itre Federal funds provided by the subawrard. <br />Management fees -or similar c mVes In excess of the direct costs and approved Indirect rates are not allowable. The term <br />`management fees or armor charges' refers to enure mss added to the direct costs In order to accu muleeend "reserve 4undafor <br />— arrgcng business s eases, unforeseen ltabil as, or for other similar costs which are root allowable under• thb assistance <br />agreement. Management fees or aimllarchaogm may not be used to Improve or expand the project funded under this agreement, <br />except to the extent aut horned as a diteot oost of carrying out the scope of work <br />Frciarammedc Conditions <br />•1: the grantee agrees to follow procedures contained In the most current edition of the EPA Region 4. A Special Appropriations <br />Projects (SPAPs) Grant Procedures Worftbook (onflne workbook at <br />j�p:// �wweoa, aovheolon�j ►soeclafannroortations.hfr�I ). <br />2 The grantee shag follow-stl requirements under 4TCFR $ W.36 when promhV eonstructIon contracts Including: assuring full <br />aad operrcompe0on; pro_ curing by federally approved methods; pedbrmkrg a cwVpdoe analysis; and ensuring contracts Include <br />MBEMBE nequh anents, bonding requirements, compliance with federal, state and local laws, inclusion of Part 31.36(1) contract <br />provislonsj and subcontractor requirements. <br />S. The grantee agrees to- obiaUh EPA Project Ofter review and conourrenes of plans and specifications for all construction <br />contra is prior to the adveriisernent for bids. <br />4. The grantee shall notify the EPA Project Officer of" contract awards made as part of this grant and provide a copy to-EPA if <br />so requested_ <br />6. In consultation with She EPA Prolect Officer, the grantee shah conduct a pre- consWotion cordererm for each construction <br />contract awarded as part of this grant <br />The grantee vomit assure the EPA that all land, easements, and rights-of-way necessary 1br the construction of the project have <br />been obtained prior to Initiating construction. <br />7. The grantee will obtain all necessary state and local permits; Including a- permit to construct from the appropriate state agency, <br />coverage under the states NPIDES general permit for construction acHviftes, andfor a Corps of Engineers Section 404 permit (if <br />applicable), prior to Initiating construction. <br />8. The grantee sbafi submit to the EPA Project Officer a quarterly progress report beginning with the avmrd of thfs grant and a final <br />report pursuant-to 40 CFR $ 31.40. These reports wilt consist of updated progress toward work objectives, problems .encountered, <br />actions taken ID resolve problems and discussion of remaining [mica. This report may be as brief as one page so long as all the <br />requested knformatfon is provided. The items listed below should be addressed, as appropriate: <br />Quarterly Progress Report Outline <br />for <br />Special Appropriations Grants <br />Grant Number. <br />Grantee Name. <br />Project Marne: <br />Etnntee's Authofted Represenh&e. <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.