Browse
Search
Minutes - 04-17-2001
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2000's
>
2001
>
Minutes - 04-17-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2008 5:22:53 PM
Creation date
8/13/2008 1:53:35 PM
Metadata
Fields
Template:
BOCC
Date
4/17/2001
Document Type
Minutes
Document Relationships
Agenda - 04-17-2001-10a
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 04-17-2001
Agenda - 04-17-2001-10c
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 04-17-2001
Agenda - 04-17-2001-5a
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 04-17-2001
Agenda - 04-17-2001-5b
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 04-17-2001
Agenda - 04-17-2001-5c
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 04-17-2001
Agenda - 04-17-2001-5d
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 04-17-2001
Agenda - 04-17-2001-8a
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 04-17-2001
Agenda - 04-17-2001-8b
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 04-17-2001
Agenda - 04-17-2001-8c
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 04-17-2001
Agenda - 04-17-2001-8d
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 04-17-2001
Agenda - 04-17-2001-8e
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 04-17-2001
Agenda - 04-17-2001-8f
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 04-17-2001
Agenda - 04-17-2001-8g
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 04-17-2001
Agenda - 04-17-2001-8h
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 04-17-2001
Agenda - 04-17-2001-8i
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 04-17-2001
Agenda - 04-17-2001-8j
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 04-17-2001
Agenda - 04-17-2001-8k
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 04-17-2001
Agenda - 04-17-2001-8l
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 04-17-2001
Agenda - 04-17-2001-9a
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 04-17-2001
Agenda - 04-17-2001-9b
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 04-17-2001
Agenda - 04-17-2001-9c
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 04-17-2001
Agenda - 04-17-2001-9e
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 04-17-2001
Agenda - 04-17-2001-9f
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 04-17-2001
Agenda - 04-17-2001-9g
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 04-17-2001
Agenda - 04-17-2001-9h
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 04-17-2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OF ORANGE COUNTY <br />Whereas, on November 20, 1984, the Orange County Board of Commissioners resolved to construct <br />Phase I of the Efland Sewer Systems which in its boundaries and in its engineering consisted of Phase I <br />of the John R. McAdams Company Water and Sewer Extension Feasibility Report; and <br />Whereas, on September 30, 1986, the Orange County Board of Commissioners approved boundary and <br />design changes to the overall system plan when it approved design changes recommended by the <br />Revised Preliminary Engineering Report of the Project prepared by Hazen and Sawyer, P. C., Engineers <br />and the addition of what was designated as Phase II in the McAdams Report and the joining of the <br />eastern and western portions of what was designated as Phase I in the McAdams Report; and <br />Whereas, on March 8, 1993, the Board of Commissioners of Orange County approved a boundary and <br />design change to the overall system plan when it approved the single public purpose, linear system <br />extension to serve the Hancor manufacturing facility; and <br />Whereas, on October 1, 1996, the Board of Commissioners of Orange County approved a temporary <br />design change to the overall system plan when it approved the single public purpose, temporary <br />forcemain connection to serve Lloyd's Car Wash; and <br />Whereas, on August 25, 1997, the Orange County Board of Commissioners approved a Bond Order for a <br />sewer system expansion related to the Efland Area Sewer System (approved by the voters of Orange <br />County on November 7, 1997), which ratified the commitment of the Orange County Board of <br />Commissioners to the overall system plan's inclusion of Phase I West, Phase I East, and Phase II as <br />recommended in the Revised Preliminary Engineering Report of the Project prepared by Hazen and <br />Sawyer, P. C., Engineers; and <br />Whereas, on September 7, 1999, the Board of Commissioners of Orange County approved a boundary <br />and design change to the overall system plan when it approved the single public purpose, linear system <br />extension to serve the Barber and Ross manufacturing facility; and <br />Where, on August 15, 2000, the Board of Commissioners of Orange County approved a boundary and <br />design change to the overall system plan when it approved the sewer system extension to serve the <br />Richmond Hills Subdivision; and <br />Whereas, the present overall system plan boundary is illustrated on the map which is an exhibit to this <br />resolution and includes Phase I West, Phase I East, Phase II, the Hancor extension, the Barber and <br />Ross extension, and the Richmond Hills extension. <br />Now Therefore Be it Resolved by the Board of Orange County Commissioners: <br />1. The Efland Area Sewer System overall system plan boundary is confirmed and ratified to <br />include Phase I West, Phase I East, Phase II and the system boundary extensions all as shown <br />of the Efland Area Sewer Overall System Plan map which is an exhibit to this Resolution. <br />2. The overall system plan design is the design for Phase I West, Phase I East, and Phase I I per <br />the Hazen and Sawyer report together with the design approved by the Orange County Board <br />of Commissioners for the Hancor, Barber and Ross, and Richmond Hills extensions together <br />with the temporary forcemain connection for Lloyd's Car Wash (this connection is subject to all <br />of the terms and conditions of the October 1, 1996 Resolution). <br />This, the 17th day of April 2001. <br />VOTE: UNANIMOUS <br />
The URL can be used to link to this page
Your browser does not support the video tag.