Orange County NC Website
I <br /> t <br /> CORLEY REDFOOT ZACKINC. <br /> ARCHITECTS • ENGINEERS • PLANNERS <br /> July 29,2011 <br /> Ms.Pamela K.Jones,Director <br /> Asset Management&Purchasing <br /> Orange County <br /> GLENN D.CORLEY,AIA P.O.Box 8181 <br /> Chairman <br /> KENNETH H.REDPOOT,AIA,LBBD AP Hillsborough,NC 27278 <br /> President <br /> MICHAEL L.HAMMERSLEY,PE RE: PROPOSAL FOR PROFESSIONAL DESIGN SERVICES FOR <br /> Partner Stormwater Issues at 129 E.King Street,Hillsborough <br /> ANDREW R.CRUICKSHANK,AIA,LEEDAP <br /> Partner <br /> Dear Ms.Jones: <br /> DAVID M.TAYLOR,AIA,LEEDAP <br /> Partner <br /> KIMBERLY D.BUFF,AIA,LEBDAP Corley Redfoot Zack,Inc.,is pleased to provide our fee proposal for Civil <br /> Associate Engineering design services to investigate the conditions and provide <br /> HARRY M.JENSEN construction documents for repairs to the stormwater issues at the 129 East <br /> Associate King Street building. <br /> KENNETH E.SMITH <br /> Associate <br /> CRZ's scope of work will include the Civil Engineering services to design a <br /> new stormwater system to reroute the stormwater from under the existing <br /> building to a point in the parking lot south of the building. The new <br /> design will also replace an existing damaged 24"vitrified clay pipe located <br /> in an existing tunnel under the south parking lot with a new reinforced- <br /> concrete pipe. The scope of work includes the tie-in of all existing roof <br /> downspouts to a storm system that will carry the flow underground to the <br /> front of the site. The area at the rear of the building now drains to an <br /> existing pipe under the building. This pipe behind the building will also <br /> be relocated to the front via the storm lines for the downspouts. <br /> PO Box 2368 Additional storm lines may be required as we continue the investigation <br /> Chapel Hill,NC 27515-2368 and review all survey data. Construction Documents will be developed for <br /> 222 Cloister Court informal bidding based upon our findings. Construction Administration <br /> Chapel Hill,NC 27514-2212 will be required in the contract to monitor the repairs and review <br /> unforeseen conditions during the repairs. <br /> CRZ's proposed design fee is a not-to-exceed amount of$16,380. We will <br /> { bill for actual hours worked as we move forward through the design and <br /> Y E n R s <br /> L construction administration at the following hourly rates: <br /> Professional Engineer: $75/hour <br /> Project Manager: $120/hour <br /> (919) 401-8586 Telephone <br /> (919) 493-7306 Fax <br /> www.corleyredfootzack.com <br />