Browse
Search
Agenda - 08-23-2011 - 7a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 08-23-2011
>
Agenda - 08-23-2011 - 7a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2011 1:46:06 PM
Creation date
8/19/2011 1:46:01 PM
Metadata
Fields
Template:
BOCC
Date
8/23/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7a
Document Relationships
Minutes 08-23-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21 <br />PLANNING <br />BOARD <br />Ordinance RECOMMENDED <br />Requirements FINDINGS <br />5.8.4 (A} (3) (g) <br />Grading and Erosion <br />Control <br />5.8.4 (A) (3) (g) (i) Yes X No <br />Plans for-grading and <br />erosion- control shall <br />_comply-with- standards <br />contained in this <br />Ordinance, the Orange <br />County Sedimentation <br />Control Manual and, if <br />applicable, The North <br />Carolina Erosion and <br />Sedimentation Contr-ol <br />P-rogram rules; <br />EVIDENCE SUBMITTED <br />TO SUPPORT <br />FINDINGS <br />Preliminary assessment <br />by Gounty Erosion <br />Control indicates that <br />project will comply (i_e. <br />new driveway}: <br />The Planning Board <br />recommends that a <br />condition-of approval on <br />this project be that the <br />applicant comply with <br />any required conditions <br />imposed by Erosion <br />Control as their review <br />continues. <br />BOCC <br />FINDINGS <br />Yes _ No <br />5.8.4 (A) (3) (g) (ii) -Not Applicable X <br />Construction shall be- <br />phased to minimize <br />disturbance and <br />sedimentation; <br />5.8.4 (A) (3) (g) (iii) Yes X No <br />Sediment control <br />measures shall be <br />properly installed to filter <br />sediment from runoff <br />during- construction and <br />maintained until grading is <br />complete and a <br />permanent vegetative <br />cover has been <br />established and all slopes <br />stabilized; and <br />No `phased' construction <br />is proposed. <br />The Planning Board <br />recommends that a <br />condition of approval on <br />this project be that the <br />applicant comply with <br />any required conditions <br />imposed by Erosion <br />Control as their review <br />continues. <br />Not Applicable _ <br />Yes _ No <br />
The URL can be used to link to this page
Your browser does not support the video tag.