Orange County NC Website
21 <br />PLANNING <br />BOARD <br />Ordinance RECOMMENDED <br />Requirements FINDINGS <br />5.8.4 (A} (3) (g) <br />Grading and Erosion <br />Control <br />5.8.4 (A) (3) (g) (i) Yes X No <br />Plans for-grading and <br />erosion- control shall <br />_comply-with- standards <br />contained in this <br />Ordinance, the Orange <br />County Sedimentation <br />Control Manual and, if <br />applicable, The North <br />Carolina Erosion and <br />Sedimentation Contr-ol <br />P-rogram rules; <br />EVIDENCE SUBMITTED <br />TO SUPPORT <br />FINDINGS <br />Preliminary assessment <br />by Gounty Erosion <br />Control indicates that <br />project will comply (i_e. <br />new driveway}: <br />The Planning Board <br />recommends that a <br />condition-of approval on <br />this project be that the <br />applicant comply with <br />any required conditions <br />imposed by Erosion <br />Control as their review <br />continues. <br />BOCC <br />FINDINGS <br />Yes _ No <br />5.8.4 (A) (3) (g) (ii) -Not Applicable X <br />Construction shall be- <br />phased to minimize <br />disturbance and <br />sedimentation; <br />5.8.4 (A) (3) (g) (iii) Yes X No <br />Sediment control <br />measures shall be <br />properly installed to filter <br />sediment from runoff <br />during- construction and <br />maintained until grading is <br />complete and a <br />permanent vegetative <br />cover has been <br />established and all slopes <br />stabilized; and <br />No `phased' construction <br />is proposed. <br />The Planning Board <br />recommends that a <br />condition of approval on <br />this project be that the <br />applicant comply with <br />any required conditions <br />imposed by Erosion <br />Control as their review <br />continues. <br />Not Applicable _ <br />Yes _ No <br />