Browse
Search
Agenda - 08-23-2011 - 7a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 08-23-2011
>
Agenda - 08-23-2011 - 7a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2011 1:46:06 PM
Creation date
8/19/2011 1:46:01 PM
Metadata
Fields
Template:
BOCC
Date
8/23/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7a
Document Relationships
Minutes 08-23-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20 <br />Ordinance <br />Requirements <br />5.8.4 (A) (3) (e) <br />Stormwater Management <br />5.8.4 (A) (3) (e) (i) <br />A stormwater <br />management plan sh-all be <br />prepared and reviewed in <br />accordance with the <br />provisions of Section <br />6..-14 of this Ordinance. <br />5.8.4 (A) (3) (f) Drainage <br />5.8.4 (A) (3) (f) (i) <br />fAil drainage structur-es will <br />be installed and <br />maintained according to <br />the approved Stormwater <br />Management Plan. <br />5.8.4 (A) (3) (f) (ii) <br />School projects that <br />include structural <br />stormwater mreasures <br />shall comply with <br />Section 6.14 of this <br />Ordinance. <br />PLANNING <br />BOARD <br />RECOMMENDED <br />FINDINGS <br />X Yes No <br />X Yes No <br />X Yes No <br />EVIDENCE SUBMITTED <br />TO SUPPORT <br />FINDINGS <br />Preliminary assessment <br />by County Erosion <br />Control indicates that the <br />project com-plies and that <br />no additional stormwater <br />management.plans_arc <br />necessary as no-new <br />constructiorrif proposer!: <br />The Planning Board <br />recommends, however, <br />that a condition of <br />approval on this project <br />be that the applicant <br />comply with any-required <br />conditions imposed by <br />Erosion Control as their <br />review continues. <br />The Planning Board <br />recommends a condition <br />of approval on this <br />project-be that the <br />applicant comply with <br />any required conditions <br />imposed by Erosion <br />Control as their review <br />continues. <br />The Planning Board <br />recommends a condition <br />of approval on this <br />project be that the <br />applicant comply with <br />any required conditions <br />imposed by Erosion <br />Control as their review <br />continues. <br />BOCC <br />FINDINGS <br />Yes <br />_1(es <br />Yes <br />No <br />No <br />No <br />
The URL can be used to link to this page
Your browser does not support the video tag.