Browse
Search
Agenda - 08-23-2011 - 5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 08-23-2011
>
Agenda - 08-23-2011 - 5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2017 12:30:10 PM
Creation date
8/19/2011 1:23:52 PM
Metadata
Fields
Template:
BOCC
Date
8/23/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes 08-23-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br />8. Forma-l Agreement: After approval of the work write-up, the homeowner will-sign a <br />formal agreement that will explain and govern the rehabilitation process. The agreement <br />will-define the roles of the parties involved throughout the rehabilitation process. <br />9. Bidding: The work write-up and bid documents_will be mailed to three to five contractors <br />from the Approved=:Contractors_Registry who will be given two to-three weeks in which to <br />inspect the property and prepare a bid. A bid opening will be conducted by .Orange <br />County's Housing, Human Rights and Community Development office at a specified date <br />and time, will all bidders and homeowners invited to attend. <br />10. -Contractor Selection: Within 24 hours: of the bid opening, -after review of bid breakdowns <br />and construction schedules, the winning bidder will be selected. Ali- bidders and the <br />homeowners v~=ili be notified of (1) -the selection _of -the winning bid, (2) the amount _of the <br />winning bid; (3) the amount of Orange County's cost estimate, and (4) the specific reasons <br />for the selection, if other than the lowest bidder- was selected. <br />11. L-oan Closing and-Contract Execution: Loan documents will be prepared and executed <br />by the homeowner- and construction contract documents will be executed by the <br />homeowner and contractor with Orange County signing on as an interested third party. <br />12. Pre-Construction Conference: Apre-construction conference will be held at the selected <br />applicant's home.- At this time, the homeowner, contractor and- program representatives <br />will discuss the details of the work to be done. Starting and- ending dates will be fmalized, <br />along with any special arrangements such as weekend or evening work hours and <br />disposition of items to be removed from the home (such as old cabinets, etc.}. Within 24 <br />hours of the pre-construction conference, Orange County will issue a "proceed order" <br />formally instructing the contractor to commence. by the agreed-upon date. <br />13. Construction: The contractor will be responsible for obtaining a building permit for the <br />project before beginning work. The permit must be posted at the house during the entire <br />peri-od of construction. Program staff will- closely monitor the contractor during the <br />construction period to make sure that the work is being done according to the work write- <br />up (which is made a part of the rehabilitation contract by reference) and in a timely fashion. <br />Local Code Enforcement Officials will inspect the work for compliance with NC State <br />Building Code. The homeowner will be responsible for working with the contractor <br />toward protecting personal property clearing work areas as much as practicable. If <br />applicable, the contractor will obtain a permit for lead hazard related activities. <br />14. Change Orders: All changes to the scope of work must be approved by the owner, the <br />contractor, a County representative and the Rehabilitation Specialist, and reduced to <br />writing as a contract amendment ("change order"). If the changes require an adjustment in <br />the loan amount, the change must be specified in the change order. Also, a modification <br />agreement stating these changes in the contract amount must be completed by Orange <br />County, and executed by the owner. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.