Browse
Search
Agenda - 08-23-2011 - 5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 08-23-2011
>
Agenda - 08-23-2011 - 5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2017 12:30:10 PM
Creation date
8/19/2011 1:23:52 PM
Metadata
Fields
Template:
BOCC
Date
8/23/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes 08-23-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange-County ~ H <br />2011 Single-Family Rehabilitation (SFR) Program <br />PROCUREMENT POLICY <br />To the maximum extent practical, Orange County promotes a fair, open and competitive <br />procurement process as required under the North- Carolina Housing Finance Agency's Single- <br />Family Rehabilitation (SFR)- Program. Bids are invited from Contractors- who are part of the <br />County's approved contractor registry. (To be on the registry, a contractor must complete an <br />application, have their recent work inspected, reviewed and approved by the Rehabilitation <br />Specialist and submit proof of insurance at the appropriate levels required by the County.) <br />1.Thre e to six eligible contractors on the- County's approved contractor registry shall be invited <br />to bid on each job and the lowest responsive and responsible bidder shall be selected for the <br />contract. "Responsive and responsible" means (a) the contractor is deemed able to complete <br />the- work in a timely fashion, (b) the bid is within 15%, in either direction, of the County's <br />cost estimate, and (c) there is no conflict of interest (real or apparent). <br />2.Althoug h bid packages may be bundled- for multiple job sites, the bids for multiple job sites <br />shall be considered separate and apart when awarded and shall be awarded to the lowest <br />responsive and responsible bidder(s) for each job site. <br />3.B id packages shall consist of an invitation to bid, work write up(s) and Non-Collusive <br />Affidavit form (s) for each job. <br />4.B ids must include acost-per-item breakdown with line item totals equaling the submitted bid <br />price. Discrepancies must be reconciled prior to a contract being awarded. <br />S.Any change to the original scope of work_must be reduced to writing in the form of a change <br />order to be agreed upon and signed by all parties to the original contract. The change order <br />must also detail any changes to the original contract price. <br />6.No work may begin prior to a contract being awarded and a written order to proceed <br />provided to the contractor. I-n addition, apre-construction conference and "walk thru" shall <br />be held at the work site prior to commencement of repair work. <br />7.Or ange County reserves the right to reject any or all bids at any time during the procurement <br />process. <br />8.I n the event of a true emergency situation, the County reserves the right to waive normal <br />procurement procedures in favor of more expedient methods, which may include seeking <br />telephone quotes, faxed bids and the like. Should -such methods ever become necessary the <br />transaction will be fully documented. <br />9.A11 sealed bids will be opened publicly at a time and place to be announced in the bid <br />invitation. All bidders are welcome to attend. <br />This Procurement Policy is adopted this the day of 2011. <br />
The URL can be used to link to this page
Your browser does not support the video tag.