Orange County NC Website
~~' <br />Task 1: Evaluation of Optiohs <br />The efforts surrounding the first task of this work will center around the determination of the key site factors that <br />will dictate the specific type of approach to be pursued, if there are any unknown technics! reasons that would <br />prohibit the options from being pursued, and refining the cost estimate based upon the optimum approach. This <br />work will be completed within 40 days of approval of contract. <br />Task 1.1 Biting Analyst and Preliminary Layout <br />Within one week of signing contract, the wuniy will provide our team with the already completed surveys that <br />locate the existing wells, septic fields, topographic characteristics, flee focadons, buildings, outdoor structures, <br />utilities, setbacks, property lines, and currant play areas and the ball field. Add'Rionally, they will provide our team <br />with information on the existing well characteristics (flow rate, depth, water contaminants). <br />Based upon initial site evaluations, discussions with your county officials, and input from state agencies, we will <br />identify potential strategies and the corresponding potential krcatbns of the various system components. <br />Tssk 1.2 Solt. Hydraulk;, and FNk! Layout <br />This work ir>cludes technical soils and site evaluatbn of the options as they relate to regulations required for <br />subsurface systems; hydraulic testing of soil using an Arnoozenteter (as required for systems greater than 3,000 <br />gpd); one gsoprobe boring th groundwathr, hydraulic mounding modeNng; and the nitrifiication field layout and <br />specilk:atlons for the 6,000 gpd system. The evaluation will also address your ooncem regarding any potential <br />impact the system -might have on the existing trees. <br />Task 1.3 Evaluation of Exiting PlumbMg and Etctrical <br />This work wNl consist of a detalted evaluation of the existing plumbing, septic, and well systems in order to <br />determine the optimum connection points and any n~iping naquirements. The current and anticipated electrical <br />system will also be evaluated as it relates to the andcipeted electrical service demands. , We wiM provide you with <br />a report summarizing our conclusions. <br />Task 1 A Evaluation of Functional and Educational Impacts <br />We will analyze the site from a fixxdional and an educational standpoint, to determine the best opportunities and <br />limitations for locating particular components of the system. 1Ne will evaluate the maintenance, security and <br />safety issues and provide you a report summarizing our recommendations. <br />Task 1.6 i~nliminary Review with County and Stab Agencies <br />Although there will not be enough of the design completed at this point to guarantee final acceptance, we will <br />review the proposed strategy with the appropriate state and county agendas as to determine their general <br />acceptance- of our appros~ch. <br />E 'd 89Eti'oN N91S30 3h11dA0NNl Wdl9~l EOOl '9 '^oN <br />