Browse
Search
2003 NS Purchasing - Innovative Design for Wastewater Treatment Design Services at NHSC and Feasibility Analysis of Sustainable Design Elements
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2003
>
2003 NS Purchasing - Innovative Design for Wastewater Treatment Design Services at NHSC and Feasibility Analysis of Sustainable Design Elements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2011 2:00:16 PM
Creation date
8/17/2011 2:00:13 PM
Metadata
Fields
Template:
BOCC
Date
12/9/2011
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
8g
Document Relationships
Agenda - 12-09-2003-8g
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2003\Agenda - 12-09-2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
., <br />1 hour x $125hour <br />Task E9: Unknown (to be determined during audit) <br />ID 3 hours x $90/hour <br />1 hour x $125/hour <br />Padia 4 hours x $90/hour <br />1 hour x $90/hour <br />Total Energy Tasks E1-E7 <br />Water <br />$ 12S <br />$ 270 <br />$ 125 <br />$ 360 <br />$ 125 <br />$] 3,590 <br />Task W 1: Rainwater catchment system (for toilet flushing <br />and irrigation. One option would be to just look ai <br />supplying new toilets required for facility/park and <br />another would be to modify existing plumbing in <br />gang toilets). Boih could help in irrigating ball field. <br />ID l0 hours x $90/hour $ 900 <br />1 hour x $125/hour $ 125 <br />Padia 4 hours x $90/hour $ 360 <br />2 hours x $125/hour $ 250 <br />Task WZ: Water Saving Fixtures <br />Padia 6 hours x $90/hour $ 540 <br />1 hour x $l25/hour $ 125 <br />Task W3: Living Machine in comparison to septic <br />ID l 6 hours x $90/hour $ 1,440 <br />3 hours x $ i 25/hour $ 375 <br />Padia I6 hours x $90/hour $ 1,440 <br />3 hours x $125/hour $ 37S <br />Total of Tasks W1-W3 $ 5,930 <br />
The URL can be used to link to this page
Your browser does not support the video tag.