Orange County NC Website
., <br />1 hour x $125hour <br />Task E9: Unknown (to be determined during audit) <br />ID 3 hours x $90/hour <br />1 hour x $125/hour <br />Padia 4 hours x $90/hour <br />1 hour x $90/hour <br />Total Energy Tasks E1-E7 <br />Water <br />$ 12S <br />$ 270 <br />$ 125 <br />$ 360 <br />$ 125 <br />$] 3,590 <br />Task W 1: Rainwater catchment system (for toilet flushing <br />and irrigation. One option would be to just look ai <br />supplying new toilets required for facility/park and <br />another would be to modify existing plumbing in <br />gang toilets). Boih could help in irrigating ball field. <br />ID l0 hours x $90/hour $ 900 <br />1 hour x $125/hour $ 125 <br />Padia 4 hours x $90/hour $ 360 <br />2 hours x $125/hour $ 250 <br />Task WZ: Water Saving Fixtures <br />Padia 6 hours x $90/hour $ 540 <br />1 hour x $l25/hour $ 125 <br />Task W3: Living Machine in comparison to septic <br />ID l 6 hours x $90/hour $ 1,440 <br />3 hours x $ i 25/hour $ 375 <br />Padia I6 hours x $90/hour $ 1,440 <br />3 hours x $125/hour $ 37S <br />Total of Tasks W1-W3 $ 5,930 <br />