Browse
Search
ORD-2003-183 - Budget Amendment #7
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2003
>
ORD-2003-183 - Budget Amendment #7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2011 12:36:14 PM
Creation date
8/17/2011 12:33:34 PM
Metadata
Fields
Template:
BOCC
Date
12/9/2003
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
8e
Document Relationships
Agenda - 12-09-2003-8e
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2003\Agenda - 12-09-2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Compliance Officer positions effective January 1, 2004 within the Inspector's Division of the <br />Planning Department. The estimated personnel, operating, and one-time start-up costs <br />associated with these four positions are approximately $175,000 for FY 2003-04. This <br />budget amendment allows for an appropriation of $175,000 from the County's General Fund <br />fund balance to pay for these positions. (See Attachment 1, column #2) <br />Orange County Schools Middle School- #3 <br />3. In November 2000, the Board of Commissioners approved a Policy on Planning and <br />Funding School Capital .Projects. That .policy identifies two levels of school construction <br />projects -Level 1 and Level 2. Level 1 projects are those projects that have a relatively <br />small scope of work and can be accomplished using a single prime contractor, in house staff <br />or entail purchasing equipment and vehicles. Level 2 projects are major projects that require <br />several phases,to complete. For these projects, the Commissioners approve project funding <br />in four phases: <br />• Concept/Pre-Planning Phase -includes preliminary programming and design <br />work that would result in conceptual drawings and preliminary cost estimates <br />• Planning Phases -includes siting the facility, construction of infrastructure, and <br />preparation of construction documents in preparation for the bidding process <br />• Design and Construction Phases -includes final design, facility construction and <br />purchase of equipment, furnishings, technology and one time start up costs <br />• Final Accounting Phase - provides a reconciliation of actual project expenditures <br />with approved budget <br />Funds in the amount of $18.5 million were included in the voter approved November 2001 <br />bond referendum for siting and construction of a third middle school in the Orange County <br />School system. On June 26, 2003, the Board of County Commissioners approved "the <br />option purchase price of $38,505 for option to purchase agreements to be executed <br />between the Orange County Schools and the respective property owners for the parcels <br />comprising the proposed site for the OCS middle school. The acreage being considered for <br />purchase is up to 100.62 acres with a total purchase price is $1,283,500. The amount of <br />$38,505 covered the cost of a six-month purchase option for OCS for land located in the <br />Efland area. <br />.While waiting for the land transaction to be completed, Orange County Schools has moved <br />forward with preliminary design and site work for the new middle school. OCS and County <br />staff and attorneys have been collaborating,. along with the designated, project <br />representatives of both governing boards and the OCS-selected architectural firm, to identify <br />and work through land use and utility infrastructure matters related to this project. The <br />Orange County Board of Education recently received a report on the preliminary conceptual <br />site design of the proposed school site. In keeping with the BOCC's Policy on Planning and <br />Funding School Capital Projects Policy, the District pursued a prototypical building. design: <br />The Board of Education has worked with Corley, Redfoot and Zack, Architects, to design a <br />new middle school that, for the. most part, is a prototype of the Chapel Hill-Carrboro City <br />Schools' R. D. and Euzelle Smith Middle School <br />
The URL can be used to link to this page
Your browser does not support the video tag.