Browse
Search
2011-258 Housing - Inter-Church Council Housing Corp. - Developmental Agreement - OC HOME Consortium
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-258 Housing - Inter-Church Council Housing Corp. - Developmental Agreement - OC HOME Consortium
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2018 9:03:16 AM
Creation date
8/15/2011 10:31:25 AM
Metadata
Fields
Template:
Contract
Date
7/22/2011
Contract Starting Date
8/5/2011
Contract Document Type
Agreement
Agenda Item
Manager Signed
Amount
$100,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> Lawns and Planting: Estimated cost of repairs-----------------------------------------------$ 16,000 <br /> 1) Provide additional plantings and mulch thru-out property as shown on plans. <br /> 2) Spread topsoil and re-seed bare areas as required. <br /> 3) Prune existing trees and shrubs of dead wood to clear walls and roof. <br /> 4) Identify low areas that hold water and fill with topsoil and seed. <br /> 5) Clear all storm drains of debris and soil. <br /> 6) Provide landscaping around project entry signs. <br /> 7) Re-grade flat site areas to slope away from buildings and provide swales. <br /> General Conditions: <br /> 1) Provide evidence of maintained Workman Compensation Insurance coverage as <br /> specified. <br /> 2) Provide evidence of maintained Liability Insurance($500,000/$1,000,000). <br /> 3) All work shall conform to all applicable codes. <br /> 4) All work shall be professional and guaranteed and warranted for one year. <br /> 5) All materials and products shall conform to manufacturer's recommendations. <br /> 6) All bidders shall visit and inspect jobsite prior to bidding to confirm all quantities and <br /> measurements. <br /> 7) "Provide"means furnish all materials, equipment, labor, and insurance to complete <br /> project. <br /> 8) Contractor shall complete punch list and inspect each unit prior to turn-over to property <br /> manager. <br /> 9) Contractor shall final clean each unit immediately prior to turn-over to property manager. <br /> 10)Contractor shall prepare sequencing plan (schedule)for re-location and staging of work <br /> to property manager and HUD Architectural &Engineering Branch prior to starting <br /> work. <br /> The total cost of these repairs are estimated to be$3,339,763.00. <br /> Randy W. ickers,Construction Analyst <br /> HUD Greensboro Multifamily HUB <br />
The URL can be used to link to this page
Your browser does not support the video tag.