Browse
Search
2011-258 Housing - Inter-Church Council Housing Corp. - Developmental Agreement - OC HOME Consortium
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-258 Housing - Inter-Church Council Housing Corp. - Developmental Agreement - OC HOME Consortium
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2018 9:03:16 AM
Creation date
8/15/2011 10:31:25 AM
Metadata
Fields
Template:
Contract
Date
7/22/2011
Contract Starting Date
8/5/2011
Contract Document Type
Agreement
Agenda Item
Manager Signed
Amount
$100,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> 5) Provide passage set,dead bolt, and security viewer at each front entry door and passage <br /> set and dead bolt at each rear entry door as specified. <br /> Windows: Estimated cost of repairs-----------------------------------------------------------$115,728 <br /> 1) Replace vinyl windows as specified and shown on plans. <br /> Drywall: Estimated cost of repairs-------------------------------------------------------------$67,000 <br /> 1) Repair and/or replace all damaged wallboard as specified. <br /> 2) Repair ceilings below bathrooms as specified and shown on plans. <br /> 3) Repair wallboard removed for new utilities as shown on plans. <br /> 4) Patch walls and corners at new windows and doors as shown on plans. <br /> 5) Provide wallboard at HVAC chases and fury-downs as specified and shown on plans. <br /> Painting Work: Estimated cost of repairs------------------------------------------------------$224 831 <br /> 1) Paint entire interior of each dwelling unit as specified and shown on plans. <br /> 2) Paint all doors and trim with semi-gloss paint as specified. <br /> 3) Prepare and sand all surfaces prior to painting as specified. <br /> 4) Paint and/or spray ceilings as specified. <br /> 5) Caulk all joints as specified. <br /> Specialties: Estimated cost of repairs-----------------------------------------------------------$ 47 203 <br /> 1) Provide new finish hardware as specified and shown on plans. <br /> 2) Provide new bath accessories in each bath as specified and shown on plans. <br /> 3) Provide new shelving as specified and shown on plans. <br /> 4) Provide new fire extinguishers as specified and shown on plans. <br /> Cabinets: Estimated cost of repairs--------------------------------------------------------------$192,232 <br /> 1) Provide new kitchen cabinets as specified and shown on plans. <br /> 2) Provide new countertops as specified and shown on plans. <br /> Appliances: Estimated cost of repairs-----------------------------------------------------------$132,483 <br /> 1) Provide new frost-free refrigerators with Energy Star rating as specified and shown on <br /> plans. <br /> 2) Provide new electric range and ovens as specified and shown on plans. <br /> 3) Provide new re-circulating range hoods as specified and shown on plans. <br /> Carpets: Estimated cost of repairs--------------------------------------------------------------$133,150 <br /> 1) Provide new carpet as specified and shown on plans. <br /> 2) Provide new vinyl flooring as specified and shown on plans. <br /> Plumbing Work: Estimated cost of repairs----------------------------------------------------$207,597 <br /> 1) Inspect plumbing systems and replace damaged washers, P-Traps, and valves. <br /> 2) Replace water closets as specified and shown on plans. <br /> 3) Provide all plumbing fixtures as specified and shown on plans. <br />
The URL can be used to link to this page
Your browser does not support the video tag.