Browse
Search
2011-258 Housing - Inter-Church Council Housing Corp. - Developmental Agreement - OC HOME Consortium
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-258 Housing - Inter-Church Council Housing Corp. - Developmental Agreement - OC HOME Consortium
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2018 9:03:16 AM
Creation date
8/15/2011 10:31:25 AM
Metadata
Fields
Template:
Contract
Date
7/22/2011
Contract Starting Date
8/5/2011
Contract Document Type
Agreement
Agenda Item
Manager Signed
Amount
$100,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date: October 20,2010 <br /> Subject: 221(d)(3) <br /> InChuCo Apartments <br /> 053-36057 <br /> Chapel Hill,North Carolina <br /> Items of Repairs at a total estimate cost of$3.339.763.00 are identified in the Schedule of <br /> Repairs;Scope of Work; the Contractor's Estimate(2328); Blue Prints and Specifications <br /> by Clinton E. Gravely Architects, dated June,2010. <br /> Concrete Work: Estimated cost of repairs--------------------------------------------------------$20,000 <br /> 1) Repair/replace gyperete floors as specified and shown on plans. <br /> Metals: Estimated cost of repairs-----------------------------------------------------------------$56,182 <br /> 1) Replace metal railings as specified and shown on plans. <br /> 2) Replace sheet metal and metal flashing as specified and shown on plans. <br /> Rough CWgntLry Work: Estimated cost of repairs---------------------------------------------$431,654 <br /> 1) DEMO,misc.rough carpentry work <br /> 2) Exterior door and window installation <br /> 3) Siding,treated wood, and flashing installation <br /> Finish Carpentry Work: Estimated cost of repairs---------------------------------------------$115,501 <br /> 1) Install trim as specified and shown on plans. <br /> 2) Install.interior doors, misc. trim and moldings <br /> Insulation: Estimated cost of repairs-------------------------------------------------------------$28,050 <br /> 1) Inspect all attic insulation&up-grade to R-38 as specified and shown on plans <br /> 2) Install new R-13 insulation at new walls at DEMO areas. <br /> Roofine: Estimated cost of repairs----------------------------------------------------------------$80,269 <br /> 1) Remove existing roof shingles on all buildings to bare wood, inspect all wood sheathing, <br /> and replace as needed. Replace with new asphalt shingles as specified. <br /> 2) Install new ridge vents as specified. <br /> 3) Install new aluminum flashing&drip edge as specified. <br /> 4) Remove existing vent pipe collars and install new vent pipe flashing and sleeves as <br /> specified. <br /> Doors: Estimated cost of repairs-----------------------------------------------------------------$126,095 <br /> 1) Provide new insulated doors at front and rear as specified and shown on plans. <br /> 2) Provide new interior doors as specified and shown on plans. <br /> 3) Provide new door frames as specified and shown on plans. <br /> 4) Provide new door hardware for all new doors as specified. <br />
The URL can be used to link to this page
Your browser does not support the video tag.