Browse
Search
Minutes - 01-31-2001
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2000's
>
2001
>
Minutes - 01-31-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2008 5:30:45 PM
Creation date
8/13/2008 1:51:43 PM
Metadata
Fields
Template:
BOCC
Date
1/31/2001
Document Type
Minutes
Document Relationships
Agenda - 01-31-2001
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 01-31-2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. PROPOSED DEVELOPMENT: THE PRESERVE NEAR PATHWAYS ELEMENTARY <br />SCHOOL <br />a. Staff Comments <br />Orange County Planning Director Craig Benedict made opening comments. The <br />Preserve is a planned development that was submitted in June 2000. It has been under review by <br />staff for an eventual public hearing on this matter. The project is approximately 470 acres with 612 <br />units. It is located north of Hillsborough, between NC 57 and NC 86, just north of the Pathways <br />Elementary School. The project is being suggested as a planned development, which involves a <br />special use permit. One of the issues that is not within the County's purview is the water and <br />sewer connections. The project can only succeed with public water and sewer. <br />Mayor Johnson said that in January some representatives from The Preserve were <br />seeking permission to obtain water and sewer. He said that the Town needs a clear process for <br />developers to follow in obtaining permission to go forward. Hillsborough needs the Board of <br />County Commissioners' help in answering these questions. <br />Chair Halkiotis noted that representatives of the Board of County Commissioners and <br />the Hillsborough Tawn Board have been working together on the EDDs along old NC 8611-40 and <br />new NC 8611-85. He said that the County and the Town have many things in common and many <br />things at stake. <br />b. Presentation by the Applicant <br />Mr. Anthony {Tony) M. Natelli, Chairman of Natelli Communities introduced himself and <br />talked about Natelli Communities. They are from Montgomery County Maryland, which is outside <br />of Washington, D. C. He spoke to Board of County Commissioners in December 2000. Natelli <br />Communities has done development in bath Maryland and Virginia and the communities vary in <br />size. The price range of the homes varies from $100,000 to $1 million depending on the market. <br />He talked about why they were interested in this particular area. This particular community is of <br />such great interest to them because they believe the community would be a great asset to the <br />County and that the residents would be proud of it. They plan to keep the existing vegetation and <br />add new landscaping to beautify the area. The project will be a retail and office village, enhancing <br />the quality of life in the community as well as outside the community. Various types of homes will <br />be built. The new landscaping will blend in with the rest of the County. There will be a recreation <br />area of over 20 acres, which will provide swimming, tennis, soccer, a park, etc. There will be 200 <br />acres of green space, which will be left in its natural state to be deeded to the County to be used to <br />expand its park facilities. <br />Jerry Turner of Jerry Turner and Associates showed the plan on a map. One of the <br />features of the plan is a parkway, which runs through the entire project. The project is made up of <br />seven neighborhoods, a town center, a government services center, recreation, a day care center, <br />and dedicated open space. The residential villages vary in density from 1.89 units per acre to 6.29 <br />units per acre. Each village will have its own entrance off of the parkway. <br />Tim Michael of the John R. McAdams Company talked about the traffic issues for The <br />Preserve. He pointed out the existing road to the school site, which will eventually connect to the <br />proposed Western Bypass. They have been in discussions with NCDOT about how The Preserve <br />can best be served with some off-site road improvements. They have focused on two major <br />intersections - NC 86/US 70 and NC 86/NC 57. A traffic impact analysis has also been completed. <br />NCDOT is suggesting that the left turn lane on NC 57 be lengthened by 200-300 feet. The <br />developer has also proposed to NCDOT improvements to improve the situation on US 70 around <br />Orange High School Road. <br />
The URL can be used to link to this page
Your browser does not support the video tag.