Browse
Search
ORD-2003-142 PD-1-03 State Employees Credit Union Addition Special use permit
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2003
>
ORD-2003-142 PD-1-03 State Employees Credit Union Addition Special use permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2011 3:49:35 PM
Creation date
8/12/2011 3:49:27 PM
Metadata
Fields
Template:
BOCC
Date
11/24/2003
Meeting Type
Public Hearing
Document Type
Ordinance
Agenda Item
C.1.a
Document Relationships
Agenda - 11-24-2003-c1a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2003\Agenda - 11-24-2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />JA1~tES B. HUNT ~R. <br />GOVER,VOR <br /> <br />ORANGE COUNTY <br />~s r M s' <br />~~'°'' <br />STATE OF NORTH CAROLINA <br />DEPARTNI~NT.OF TRANSPORTATION <br />DIVISION OF HIGHI~VAYS <br />P. 0. Hox 766 <br />Graham, North Carolina 27253-0766 <br />16 September 1997 <br />Eddie Kirk <br />Orange County .Planning Department <br />306F Revere Road <br />Hillsborough, NC 27278 <br />919 732-8181 EXT 2580 <br />tf i <br />G~tu~ty ~ B. G.~w~n-) R <br />SECRETARY <br />SUBJECT: Final Plan Review: State Employees Credit Union <br />(Hillsborough) <br />Dear Mr. Kirk: <br />This office has .completed its review of the subject's proposed <br />final plans for compliance with current Department of Transportation <br />minimum construction standards. We wish to advise that the final <br />plans received at this office on 12 September 1997 are under standby <br />status awaiting revisions. Pursuant to any approval,. this office <br />will require the owner/developer to meet the following requirements <br />before starting any construction. <br />1. Prior .to any construction of any new access or alteration of any <br />existing access within the right of way, the developer/owner is <br />required to secure a permit with this office.. It is the <br />responsibility of the owner/developer to obtain a permit. <br />2.~During the construction, it is the responsibility of the. <br />owner/developer to provide verification certifying that the <br />roadway surface, drainage, and seeding satisfies the approved <br />design outside the State's right of way. <br />3. When working within. the State's right of way, the,- <br />owner/developer will contact the Graham District OfFice before. <br />each of the following phases: (A) Drainage, (B) Grading, (C) <br />Placement of base, (D) Paving, and (E} Seeding.. Failure to <br />notify this office before .each phase of construction may-justify <br />a verification certified and signed by a professional engineer. <br />5. any area within the State's right of way and/or easements <br />disturbed during the construction and/or maintenance shall be <br />repaired to the satisfaction of the District Engineer or his <br />representative.. ~ ~ -_ ---- ------- -- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.