Orange County NC Website
Q~"2 <br />ARTICLE 6.29 -DEVELOPMENT STANDARDS FOR ECONOMIC DEVELOPMENT (ED) DISTRICTS <br />("Yes' indicates compliance• 'No" indicates non -compliance) (continued) <br />Ordinance Requirements <br />i) stormwater .control. <br />Protective measures shall <br />ensure that removal of <br />stormwater runoff will not <br />adversely affect neighboring <br />properties or the public storm <br />drainage. system. Provisions <br />shall be made for construction <br />of wastewater facilities <br />including grading, gutters, and <br />piping to direct stormwater <br />and prevent erosion. Surface <br />water on all paved areas shall <br />be collected at intervals that <br />do not obstruct vehicular or <br />pedestrian traffic. <br />j) Exterior lighting. Location, <br />type, size and direction of <br />exterior lighting shall not glare <br />or .direct illumination that <br />interferes. with adjacent <br />properties or safety of public <br />rights-of-way. <br />k) Protection of property <br />values. Elements of a site plan <br />shalt be arranged to have <br />minimum negative impact on <br />values of adjoining property <br />and. other on-site uses. <br />SpeciFc standards <br />Unless otherwise indicated <br />here, .the relevant standards <br />for the specific Economic <br />Development Districts shall <br />apply. Where actions, <br />designs, or solutians proposed <br />by the applicant are not <br />literally in accord with -the <br />applicable regulations of this <br />ordinance, but the Board of <br />County Commissioners makes <br />a finding in the particular case <br />that public purposes are <br />satisfied to an equivalent or <br />greater degree, the Board may <br />make specific modification of <br />the regulations in the <br />particular case. Any <br />modification of regulations <br />shall be explicitly indicated in <br />the approved permit. <br />PLANNING STAFF <br />RECOMMENDED EVIDENCE SUBMITTED <br />FINDINGS TO SUPPORT FINDINGS <br />_x Yes No Orange County Erosion <br />Control has reviewed <br />protective measures for <br />removal of stormwater <br />runoff. <br />_x_Yes No Exterior lighting meets all <br />requirements including glare, <br />direction and safety <br />requirements of the lighting <br />standards in the Orange <br />County Zoning Ordinance. <br />_x_Yes No Elements of the site plan <br />have been arranged to <br />provide setbacks and buffers <br />to have minimum negative <br />impact on adjoining <br />properties. <br />The ED-LNR zone requires <br />structures less than .5,000 <br />square feet, no drive through <br />facilities and a building height <br />restricted to 30 feet. The <br />applicant is requesting the <br />Board make specific <br />modifications on these <br />requirements to allow the <br />following: <br />1. Two structures on the <br />site. The existing building will <br />be expanded to 7,334 sq. ft. <br />and the remote teller station <br />is 634 sq. ft. with a <br />proposed new canopy of <br />approximately 2,000 sq, ft, <br />2. Relocate existing drive <br />through lanes and add a fifth <br />one. <br />3. The existing. building <br />height is 35 feet. <br /> <br />PLANNING BOARD <br />FINDINGS <br />Yes <br />Yes <br />No <br />No <br />Yes <br />No <br />