Browse
Search
ORD-2003-142 PD-1-03 State Employees Credit Union Addition Special use permit
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2003
>
ORD-2003-142 PD-1-03 State Employees Credit Union Addition Special use permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2011 3:49:35 PM
Creation date
8/12/2011 3:49:27 PM
Metadata
Fields
Template:
BOCC
Date
11/24/2003
Meeting Type
Public Hearing
Document Type
Ordinance
Agenda Item
C.1.a
Document Relationships
Agenda - 11-24-2003-c1a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2003\Agenda - 11-24-2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hillsborough State Employees Credit Union <br />Stormwater Report <br />Project # 70994252 <br />Computer Modei Lnput for Watershed Areas <br />Through the use of HydroCAD, many aspects of the effluent flaw were analyzed. The program requires <br />certain input regarding the characteristics of the land. The input required is: <br />1. Design Storm information <br />a. Length of storm <br />b. Depth of rainfall <br />c. Time increment for analysis (dt) <br />2. Time of Concentration <br />3. Composite Areas with Corresponding SCS Runoff Curve Numbers <br />esrgn torms <br />An SCS Type II 24 Hour rainfall distribution was assumed for the storm analysis, with 0.01-hour <br />increments. A rainfall of 3.00 inches was used for the one-year storm analysis. For the 10-year storm, 5.38 <br />inches of rainfall was used. <br />Time. of Concentration <br />The time of concentration route was identified as the longest path that water would flow to reach the pond. <br />Each route was broken into two segments: sheet flow and shallow concentrated flow.. TR55 methods were <br />used to calculate the sheet and shallow concentrated flow times, through the HydroCAD program, <br />Con~osite Areas and Corresponding- SCS Runoff Curve Numbers <br />The composite areas were entered into HydroCAD using measurements taken from the design drawings. <br />The corresponding SCS curve numbers were selected based on the surface composition, and can be seen in <br />the HydroCAD reports included in Appendix A. <br />Summary <br />After careful consideration of the pre and post development conditions at the Hillsborough State <br />Employees Credit Union, discussions with the Orange County Inspections Department, Landscape <br />Architects from O'Brien Atkins, and after taking concerns for the surrounding watershed into <br />consideration, the proposed stormwater plan was developed. This plan incorporates the existing <br />stornrwater structures and the addition of a new underground detention system <br />08/08/03 Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.