Browse
Search
ORD-2003-142 PD-1-03 State Employees Credit Union Addition Special use permit
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2003
>
ORD-2003-142 PD-1-03 State Employees Credit Union Addition Special use permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2011 3:49:35 PM
Creation date
8/12/2011 3:49:27 PM
Metadata
Fields
Template:
BOCC
Date
11/24/2003
Meeting Type
Public Hearing
Document Type
Ordinance
Agenda Item
C.1.a
Document Relationships
Agenda - 11-24-2003-c1a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2003\Agenda - 11-24-2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~2 <br />Hillsborough State Employees Credit Union <br />Stormwater Report <br />Project # 70994252 <br />Project Overview <br />The State Employee's Credit union intends to increase the size of its facility and parking area at the <br />Hillsborough, North Carolina location at the comer of Old Hillsborough -Chapel Hill and Oakdale Roads. <br />The project will involve converting a new piece of land into a parking azea with a small building to service <br />a new drive through teller system <br />Methodology <br />Water Quantity <br />- - Tliis hydraulic study was preformed using HydroCAi3®6: -This-is- a software package hy-Applied- - - <br />Microcomputer Systems, which can be used to model a variety of watersheds, ponds and a <br />v ereo . wasp r~xi i'i'R-5~ii~~ivcfinsgrap~M~dr <br />Please refer to the attached sununary (Appendix A) for the peak flows and water levels and to the <br />attached calculations for details. <br />Wafer Quality <br />For nitrogen runoff analysis, the two lots were combined. and treated as one large area. The <br />nitrogen was calculated using method 1 from the Orange County Stormwater ordinance for Lands <br />within the Neuse River Basin. <br />Site Description <br />The existing credit union is on 2.26 acres, consisting of a building and parking area that takes up most of <br />the site. A detention pond is located near Oakdale Road, which drains into a culvert beneath Oakdale <br />Road. The new property is to the south of the existing building, consisting of a few small buildings, <br />driveways, fencing and a house. The new land will have a small building for new drive through tellers, and <br />additional parking. <br />Proposed Stormwater Management <br />The existing pond and Stormwater system will remain in place, with the addition of only one yard inlet. <br />The quantity of Stormwater through the existing system will increase slightly with the addition of some <br />runoff from the new site. The pond is capable of handling a large increase in quantity while still detaining <br />the runoff from the site. The current pipe system can accommodate the slight increase in flow, but would <br />not be able to .handle the runoff from the whole new property. Therefore a separate Stormwater detention <br />system for the new development was designed. <br />The new property will decrease runoff quantity to the predevelopment values through an underground <br />detention system beneath the proposed pazking area. This underground detention system will consist of <br />400' of 36" HDPE piping. <br />The outflow of the detention system will be controlled through the cap at the end of the pipes. A 5" pipe <br />will restrict the outflow in the two year storm to the pre-construction levels, and the cap will be open at the <br />top for free outflow in lazger storm events. <br />Because the post-development Nitrogen. values will be less than 10 pounds per acre per yeaz, the owners <br />plan to make a payment toward .the wetland mitigation fund and not implement any nutrient reduction <br />practices. The nitrogen calculations can be seen in Appendix B: <br />A small azea will not be directed to the stormwater detention system because of the elevation differences. <br />This water will be directed to the effluent pipe from the detention system, and the water will be directed to <br />a rip-rap dissipater pad. The value of this flow has been taken into consideration in water quantity analysis. <br />08/08/03 <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.