Browse
Search
ORD-2003-142 PD-1-03 State Employees Credit Union Addition Special use permit
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2003
>
ORD-2003-142 PD-1-03 State Employees Credit Union Addition Special use permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2011 3:49:35 PM
Creation date
8/12/2011 3:49:27 PM
Metadata
Fields
Template:
BOCC
Date
11/24/2003
Meeting Type
Public Hearing
Document Type
Ordinance
Agenda Item
C.1.a
Document Relationships
Agenda - 11-24-2003-c1a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2003\Agenda - 11-24-2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(~~8 <br />Town <br />of <br />ills <br />Sirroe i75 <br />T ~~ ~r <br />October 27, 2003 <br />Re: State Employees' Credit Union <br />- ili and Ex ansion/Renovation <br />Drive Up Fac ty p <br />2313.Old NC 86 <br />Water & Sewer Review <br />APPROVED AS NOTED <br />Mr. Ehnaz D. Kapfer, PE <br />TITANATLANTIC GROU_ P <br />5240 Green's Dairy. Road <br />e ~1~1 ~~ r~ <br />Dear Mr. Kapfer: <br />I have reviewed the water and sewer utilities plans for the State Employees' Credit Union Drive- <br />Up Facility and Expansion/Renovation dated August 7, 2003, and they are hereby Approved as <br />Noted. The following comments must be addressed prior to construction (all comments are in <br />reference to Sheet LA-3): <br />1. Backilow Prevention: A DCVA backflow preventer must be installed immediately <br />following the water meter, above-ground with an insulated box cover,. Annual testing will <br />be required of the customer, with testing data submitted to the Town. <br />2. Sanitary Sewer Profile: The length and percent grade of each section of gravity sewer <br />must be shown on the sanitary sewer profile. <br />3. Sewer Bore & Jack/Encasement Pipe: The encasement pipe must be a minimum of 12" <br />to provide adequate clearance for the 8" DI sewer pipe joints. Also, DIP is noted for the <br />encasement pipe, however, steel encasement pipe is acceptable. <br />4. Water & Sewer Connection Fees: An invoice is attached, which details the fees <br />required far connection to the To«~n water and sewer system. The Water Capital. <br />Facilities Fee is not assessed since the existing water service will be utilized.. <br />Further instnictions on the Town. requirements during and after construction can be found in the <br />"Checklist for Approval and Acceptance of Utilities Projects", which is available from my office <br />and on the Town website (www.ci.hillsborou~h.nc.us). The permit application to NCDWQ for <br />the sewer extension should be prepazed for signature by the Town Manager, Eric J. Peterson. <br />The Hillsborough Utility Inspector (Russell Lloyd, 919-201-1432) should be notified prior to <br />construction, and prior to any testing of the water and sewer facilities to be installed: As always, <br />you may notify my office if you are unable to reach the inspector. . <br />l0l East Orange Street P.O. Box 429 -Hillsborough, North Carolina 27278 <br />
The URL can be used to link to this page
Your browser does not support the video tag.