Orange County NC Website
?~~ <br />S. STATE PERMITS REQUIRED <br />1. Does the project involve the mining of earth products? <br />~r~~F~ <br />• _ If so,.how many cubi feet of material are expected to be <br />excavated? .~..~. ~ <br />Has an application for a Mining Permit been submitted to <br />' NCDRCD? <br />Please attach map indicating. expected. extent of proposed <br />ar+-ivii-v_. _ _. _.. _ <br />2. -Does the project involve generation or storage of <br />hazardous or toxic wastes, as identified by the <br />Environmental Protection Agency? (A listing of all <br />hazardous materials is available from the Planning <br />Department ) Ny-~ c.~ <br />Describe the wastes to be generated. <br />How much material is expected to be generated per month? <br />Will any material be treated onsite? <br />Volume? <br />Will any material be stored onsite? <br />.Volume? <br />Where will disposal of the material take place? <br />How will materials be transported to the disposal site? <br />What measures are proposed to protect water quality and <br />air quality in case of spills? <br />