Browse
Search
ORD-2003-141 Growth Management System - Amendments to Zoning and Subdivision Ordinances (2)
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2003
>
ORD-2003-141 Growth Management System - Amendments to Zoning and Subdivision Ordinances (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2011 10:37:53 AM
Creation date
8/12/2011 10:37:44 AM
Metadata
Fields
Template:
BOCC
Date
11/5/2003
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
9b
Document Relationships
Agenda - 11-05-2003-9b
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2003\Agenda - 11-05-2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance as Approved by BOCC <br />development of the subdivision or construction of <br />homes or other buildings and structures associated with <br />the subdivision. The mitigation plan shall include the <br />following: <br />1) An assessment of the ecological value of <br />resources that will be lost and a statement of how <br />that value will be replaced through mitigation; <br />2) A specific statement of the goals and objectives, <br />i.e., exactly what steps will be taken to <br />compensate for lost habitat, etc.; <br />3) Detailed descriptions in .the form of grading <br />plans, construction plans, and planting plans to <br />illustrate how the objectives will be carried out; <br />4) A monitoring and maintenance plan to measure <br />success of -the mitigation based on stated <br />objectives. Include a list of parties responsible <br />for monitoring and maintenance, a schedule for <br />each, and how results will be reported to the <br />Planning and Inspections Department; <br />5) A plan showing how the site will be protected <br />from impacts by human and unwanted animal <br />intrusion, alternate plant species and <br />construction methods that could be used in the <br />event adjustments or substitutions are needed <br />until the mitigation area is established; and <br />~ A financial guarantee is required for the total <br />cost of the mitigation project. Once the <br />installation is complete, thirty percent (30%) of <br />the amount of the letter of credit or escrow will <br />be held for twelve (12) months or until the site is <br />established., whichever is greater. <br />d) TRAFFIC STUDY <br />A traffic impact study is required for all applications <br />for subdivisions with more than 401ots outside of <br />transition areas, and 801ots within transition areas. <br />The study shall include an analysis~of the need for <br />public road improvements,- including pedestrian- <br />oriented enhancements, for on-site and off-site <br />improvements as said improvements relate to the level <br />
The URL can be used to link to this page
Your browser does not support the video tag.