Browse
Search
ORD-2003-141 Growth Management System - Amendments to Zoning and Subdivision Ordinances
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2003
>
ORD-2003-141 Growth Management System - Amendments to Zoning and Subdivision Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2013 12:13:34 PM
Creation date
8/12/2011 10:22:36 AM
Metadata
Fields
Template:
BOCC
Date
11/5/2003
Meeting Type
Regular Meeting
Document Type
MOU
Agenda Item
9b
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance as Approved by BOCC <br />fJ Drainage <br />1) All drainage structures will be installed and <br />maintained according to the approved <br />Stormwater Management Plan. <br />2) Subdivisions that include retention/detention <br />ponds shall comply with the requirements in <br />Section 6.23.4, Operation and Maintenance of <br />Structural Best Management Practices. <br />g) Grading and Erosion Control <br />1) Plans for grading and erosion control comply <br />with standards contained in the Orange County <br />Erosion and Sediment Control Ordinance and <br />Manual; <br />2) Construction is phased to the extent practical to <br />minimize disturbance and sedimentation; <br />3) Sediment control measures will be properly <br />installed to filter sediment from runoff during <br />construction and maintained until grading is <br />complete and a permanent vegetative cover has <br />been established and all slopes stabilized; and <br />4) Permanent landscaping, groundcover, mulch, <br />etc. will be installed as soon as practical after <br />construction activities for each phase are <br />completed. <br />h) Solid Waste Management <br />A solid waste management plan, submitted as part of <br />the Resources Management Plan, shall include the <br />method(s) of disposal and recycling of construction <br />debris. <br />i) Irrigation <br />1) Irrigation systems for the subdivision and the <br />lots in the subdivision are designed and can be <br />operated according to a water conservation plan <br />described in the Resources Management Plan <br />submitted with the application; <br />
The URL can be used to link to this page
Your browser does not support the video tag.