Browse
Search
2003 S ERCD - Contract with Legacy Research Associates, Inc. for a Cultural & Archaeological Survey of NHSC Park Property
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2003
>
2003 S ERCD - Contract with Legacy Research Associates, Inc. for a Cultural & Archaeological Survey of NHSC Park Property
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2011 2:16:15 PM
Creation date
8/11/2011 2:16:12 PM
Metadata
Fields
Template:
BOCC
Date
11/5/2003
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
8h
Document Relationships
Agenda - 11-05-2003-8h
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2003\Agenda - 11-05-2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
permits, and other necessary Federal, State, County, Municipal, or other <br />licenses as may be required to enable the Subconsultant to perform the <br />services required hereunder. <br />ARTICLE 9 -WORK BY OTHERS <br />9.1 Cooperation: Subconsultant will cooperate with Client personnel, <br />contractors and Subconsultants who may be working on the site. Particular <br />attention should be paid to such matters as safety, use and disruption of <br />utilities, the allocation of storage and workspace, parking, security and <br />general policing of the work site. <br />ARTICLE 10. -CLIENT RESPONSIBILITIES AND AUTHORITY <br />10.1. Inspection: The Client, through any authorized representatives, shall have <br />the right at all reasonable times to inspect, or otherwise evaluate the quality <br />or any other aspect of the work performed or the safety measures employed <br />in the work being performed hereunder. and .the premises in which it is being <br />performed. If any inspection or evaluation is made by .the Client on the <br />premises of the Subconsultant or a Subtier Subconsultant, the Subconsultant <br />shall provide, and shall require his Subtier Subconsultants to provide, all <br />reasonable facilities and assistance for the safety and convenience of the <br />Client representatives in the performance of their duties. All inspections and <br />evaluations shall be performed in such a manner as will not unnecessarily <br />delay the work. <br />10.2 Audit: Upon request of the Client, the accounting records, as well as other <br />records maintained by the Subconsultant directly related to the performance <br />of the work specified herein, shall be subject, at all reasonable times, to audit <br />by an independent public accounting firm. In addition, the Client may have <br />such an audit performed at any time within two years following the <br />completion or termination of work specified herein. <br />ARTICLE it -CHANGES AND CLAIMS <br />11.1 Change Authorizations: Client may unilaterally, by written order of the <br />Client's Subcontract Administrator, make changes, revisions, additions, or <br />deletions (collectively hereinafter called "changes") in the work within the <br />general scope of services provided by the Subconsultant. If any change <br />causes an increase or decrease in the Subconsultant's cost or time for the <br />performance of any part of the work, whether or not changed by such change <br />authorization, the Client shall make an equitable adjustment in the Contract <br />Time and/or Contract Price by change order. <br />11.2 Potential Changes: Subconsultant will, upon knowledge of any .potential <br />changes (including actions, inactions, and written or oral communications) <br />that do not conform to the authorized method of directing changes specified <br />above, notify .Client .within 5 working days, of such changes and request <br />written disposition. <br />11.3. Changes in Writing: Subconsultant will not proceed with any changes <br />unless notified to proceed in writing by the Client Subcontract Administrator. <br />Page 7 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.