Browse
Search
2003 NS Housing - Nannie McAdams Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2003
>
2003 NS Housing - Nannie McAdams Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2011 1:00:43 PM
Creation date
8/11/2011 1:00:42 PM
Metadata
Fields
Template:
BOCC
Date
11/5/2003
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
8f
Document Relationships
Agenda - 11-05-2003-8f
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2003\Agenda - 11-05-2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nannie McAdams <br />160 Torain St. <br />Hillsborough <br />732-7429 <br />Exterior: <br />1. Scrape and paint the foundation with two coats of flat, exterior latex paint. <br />2. Secure all loose corners on the aluminum siding. Clean the siding with a <br />cleaner formulated for aluminum siding. Paint the siding with flat, exterior <br />latex paint. Paint to cover completely. <br />3. Replace five windowsills. <br />4. Replace four pieces of 1x5 window trim with like sized lumber <br />5. Replace approx. 12 I.f. of fascia in the front of the house and approx. 36 I.f <br />in the rear of the house. <br />6. Install approx. 24 I.f. of soffitt in the rear of the house and approx.24 I.f.of <br />soffitt in the front of the house. <br />7. Cut 4x12 holes in the front and rear soffitt boards every eight feet.. <br />8. Remove all tree limbs that hang over the house. <br />9. Remove the existing carpet on the front porch. Prepare the surface for <br />carpet. Patch any holes and level any depressions in the existing <br />concrete. Install an indoor/outdoor glue-down carpet and trim on the front <br />porch. Carpet to cost not less than $4/yd. <br />10. Prepare the front porch posts for paint. Paint the posts with semigloss, <br />exterior, latex paint. Paint to cover completely. <br />11. Install two foundation vents and galvanized foundation wells in the left side <br />foundation. <br />12. Remove all trash from the crawl space. <br />13. Install aluminum, continuous gutter and downspouts. <br />14. Uncover two existing splash blocks. Install additional splash blocks under <br />the remaining downspouts. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.